Permits

Address: 5203 S 6TH AV
Date - 11/15/2024 1:50 a.m.
Total Number Of Permits - (4)
Permit Status Apply Date Expired Date Unit Type Description
TC-RES-1223-10059 Complete 12/13/2023 11/13/2024 Residential Building - One or Two Family Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
P99AN03007 ISSUED 10/15/1999 N/A ADDRNEW
T00PL00526 FINAL 03/03/2000 09/04/2000 PLUMB GAS LINE:REPAIR
T20CM07041 FINAL 10/13/2020 08/11/2021 COMBO NEW SFRS VALD000119 T19-M003

Plans

Address: 5203 S 6TH AV
Date - 11/15/2024 1:50 a.m.
Total Number Of Plans - (2)
Plan Number Status Application Date Exp Date Unit Type Description
S20-073 FINAL 12/04/2020 N/A LOT SPLIT -- LSPT LAND SPLIT - 5203 S. 6th Avenue. Split one lot into two lots.
T20PRE0118 CLOSED 09/11/2020 N/A NEIGHBORHOOD NOTIFICATION -- LABELS Minor Subdivision: Valdez Split.

Record Requests

Address: 5203 S 6TH AV
Date - 11/15/2024 1:50 a.m.
Total Number Of Requests - (1)
Request Number Status Request Date Completed Date Type Description
REQ-0424-03106 Withdrawn 04/23/2024 N/A Requests 90 DAYS EXTENTION REQUIRED AS PAVING WORK DID NOT ALLOW US TO BE AT JOB SITE Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.