Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel120093120
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningI-1
Tucson WardWard 5
Tucson Registered NeighborhoodFairgrounds
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Historic Records Requests

Address: 4601 S 3RD AV
Date - 08/19/2026 8:26 a.m.
Total Number Of Historic Records Requests - (2)
Name Action
Address: 4601 S 3RD AV - Doc Type: CERT OF OCC VIEW
Address: 4601 S 3RD AV - Doc Type: CERT OF OCC VIEW

Annexations & Original City Zoning (OCZ)

Address: 4601 S 3RD AV
Date - 08/19/2026 8:26 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Special Development Requests & Requirements

Address: 4601 S 3RD AV
Date - 08/19/2026 8:26 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000012063 CLOSED 03/10/2020 N/A Historical Information

Permits

Address: 4601 S 3RD AV
Date - 08/19/2026 8:26 a.m.
Total Number Of Permits - (17)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-1024-01942 Withdrawn 10/09/2024 01/28/2025 Right-of-Way (ROW) - Utility Cox to aerial overalsh 1000' and pull 210' of fiber through existing conduit for system tie. Permit update 10/18/2024: Undo Build task received and completed - Cancel: Contract Cancelled : CANCELED BY CARRIER. Request to withdraw permit.
TZ-CMP-0823-00151 Complete 08/01/2023 N/A Zoning Verification Letter Zoning confirmation, allowable use, conformance to code and any zoning violations or variances on file.
T18FC00285 Expired 04/06/2018 11/12/2018 Fire Construction Permit Fire Alarm & Detection Systems - INSTALL A CELLULAR TRANSMITTER TO REPLACE THE TELEPHONE LINES.; Fire Alarm Systems - Devices Modified: 1
DP20-0053 Complete 03/11/2020 01/30/2023 Development Package SITE - Water Tec of Tucson, solar, PV system.
T02BU03093 FINAL 12/12/2002 06/21/2003 SPKLR FIRE SPKR:RELOCATE 4
T07OT01806 C OF O 08/09/2007 02/09/2008 C-OF-O C OF O:WATER CONDITIONING
T07OT02140 FINAL 09/19/2007 04/05/2008 SIGN 13725
T11BU00450 FINAL 04/07/2011 11/08/2011 SPKLR ADD 5 AND RELOCATE 3 FIRE SPRINKLER HEADS.
T16RW03138 EXPIRED 12/09/2016 02/27/2017 ROW Staring on the West side of South 3rd Ave at TEP heading North overlash to Existing 1 1/4" strand for 444' then heading East adding new strand and Coax for 67' riser down pole and Trench / Bore North for 50' the East 25' Out of Row WORK ORDER # 41520160000CTU0556
T20CM02632 FINAL 04/28/2020 04/26/2021 COMBO 101.66KW PV ON 2 STEEL CANOPIES
T22RW00114 FINAL 01/18/2022 02/18/2022 ROW TEP will be working in ROW to install new equipment on TEP pole, working off of the roadway so no conflict with road traffic. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
T97BU01448 FINAL 07/30/1997 02/23/1998 SPKLR FIRE SPKR:ADD 22
T97ME00256 FINAL 07/30/1997 07/29/1998 MECH INSTALL BOILER
T98ME00105 FINAL 02/10/1998 03/21/1998 MECH PRESSURE VESSEL CERTIFICATE:TUC-20079,21198
TUC-20079 CERTIFIC 02/05/1998 09/22/1999 VESSEL
TUC-21198 CERTIFIC 02/05/1998 09/22/1999 VESSEL
TUC-22259 RENEWAL 09/17/1997 05/01/1996 VESSEL