Address Search: 4601 S 3RD AV
Search
Parcel Attributes
| Parcel | 120093120 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 5 |
| Tucson Registered Neighborhood | Fairgrounds |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Historic Records Requests
Address: 4601 S 3RD AV
Date - 08/19/2026 8:26 a.m.
Total Number Of Historic Records Requests - (2)
| Name | Action |
|---|---|
| Address: 4601 S 3RD AV - Doc Type: CERT OF OCC | |
| Address: 4601 S 3RD AV - Doc Type: CERT OF OCC |
Annexations & Original City Zoning (OCZ)
Address: 4601 S 3RD AV
Date - 08/19/2026 8:26 a.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 4601 S 3RD AV
Date - 08/19/2026 8:26 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000012063 | CLOSED | 03/10/2020 | N/A | Historical Information |
Permits
Address: 4601 S 3RD AV
Date - 08/19/2026 8:26 a.m.
Total Number Of Permits - (17)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-1024-01942 | Withdrawn | 10/09/2024 | 01/28/2025 | Right-of-Way (ROW) - Utility | Cox to aerial overalsh 1000' and pull 210' of fiber through existing conduit for system tie. Permit update 10/18/2024: Undo Build task received and completed - Cancel: Contract Cancelled : CANCELED BY CARRIER. Request to withdraw permit. | |
| TZ-CMP-0823-00151 | Complete | 08/01/2023 | N/A | Zoning Verification Letter | Zoning confirmation, allowable use, conformance to code and any zoning violations or variances on file. | |
| T18FC00285 | Expired | 04/06/2018 | 11/12/2018 | Fire Construction Permit | Fire Alarm & Detection Systems - INSTALL A CELLULAR TRANSMITTER TO REPLACE THE TELEPHONE LINES.; Fire Alarm Systems - Devices Modified: 1 | |
| DP20-0053 | Complete | 03/11/2020 | 01/30/2023 | Development Package | SITE - Water Tec of Tucson, solar, PV system. | |
| T02BU03093 | FINAL | 12/12/2002 | 06/21/2003 | SPKLR | FIRE SPKR:RELOCATE 4 | |
| T07OT01806 | C OF O | 08/09/2007 | 02/09/2008 | C-OF-O | C OF O:WATER CONDITIONING | |
| T07OT02140 | FINAL | 09/19/2007 | 04/05/2008 | SIGN | 13725 | |
| T11BU00450 | FINAL | 04/07/2011 | 11/08/2011 | SPKLR | ADD 5 AND RELOCATE 3 FIRE SPRINKLER HEADS. | |
| T16RW03138 | EXPIRED | 12/09/2016 | 02/27/2017 | ROW | Staring on the West side of South 3rd Ave at TEP heading North overlash to Existing 1 1/4" strand for 444' then heading East adding new strand and Coax for 67' riser down pole and Trench / Bore North for 50' the East 25' Out of Row WORK ORDER # 41520160000CTU0556 | |
| T20CM02632 | FINAL | 04/28/2020 | 04/26/2021 | COMBO | 101.66KW PV ON 2 STEEL CANOPIES | |
| T22RW00114 | FINAL | 01/18/2022 | 02/18/2022 | ROW | TEP will be working in ROW to install new equipment on TEP pole, working off of the roadway so no conflict with road traffic. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
| T97BU01448 | FINAL | 07/30/1997 | 02/23/1998 | SPKLR | FIRE SPKR:ADD 22 | |
| T97ME00256 | FINAL | 07/30/1997 | 07/29/1998 | MECH | INSTALL BOILER | |
| T98ME00105 | FINAL | 02/10/1998 | 03/21/1998 | MECH | PRESSURE VESSEL CERTIFICATE:TUC-20079,21198 | |
| TUC-20079 | CERTIFIC | 02/05/1998 | 09/22/1999 | VESSEL | ||
| TUC-21198 | CERTIFIC | 02/05/1998 | 09/22/1999 | VESSEL | ||
| TUC-22259 | RENEWAL | 09/17/1997 | 05/01/1996 | VESSEL |