Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search
Parcel Attributes
Parcel117050030
JurisdictionTucson
City of Tucson ZoningC-3
Tucson WardWard 6
Tucson Registered NeighborhoodPie Allen
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 442 E 6TH ST
Date - 05/15/2024 5:46 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL None

Rezoning Cases

Date - 05/15/2024 5:46 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-11-05 Downtown Links UOD UOD Closed 03/23/2011

Permits

Address: 442 E 6TH ST
Date - 05/15/2024 5:46 a.m.
Total Number Of Permits - (3)
Permit Status Apply Date Expired Date Unit Type Description
T07EL00265 FINAL 02/13/2007 09/04/2007 ELECT UPGRADE: 100 AMP (APA)
T18RW03293 FINAL 07/26/2018 12/15/2018 ROW POTHOLE 4 LOCATIONS TO IDENTIFY IF THERE ARE LEAD WATER SERVICE LINE, OK TO POTHOLE, NO PAVEMENT CUTS FOR NEW SERVICE LINES. THIS SECTION OF 6TH ST IS UNDER PAVEMENT MORATORIUM UNTIL 09/28/2019. 8/21/18 WORK DESCRIPTION CHANGE: CHANGE FROM POTHOLE 4 LOCATOINS TO REPLACEMENT OF 2 LEAD SERVICES. NOTE: PRIOR TO FINAL ASPHALT RESTORATION, APPLICANT SHALL MEET WITH THE RIGHT OF WAY INSPECTOR TO DETERMINE THE SCOPE OF THE RESTORATION. AS THIS IS UNDER A PAVEMENT MORATORIUM, APPLICANT IS RESPONSIBLE TO MILL AND OVERLAY 50 FEET FROM THE OUTSIDE OF THE ASPHALT CUTS FOR ALL AFFECTED TRAVEL LANES. ENGINEERING DOES NOT WANT A SMALL GAP BETWEEN THE EAST EDGE OF THE FINAL WEST CUT AND THE WEST EDGE OF THE FINAL EAST CUT - ONE CONTINUOUS PATCH WOULD BE PREFERABLE.
T19RW03980 FINAL 07/16/2019 08/16/2019 ROW FENCING FOR DEMOLITION OF BUILDING PLACE FENCE AROUND BUILDING; FENCING FOR THE DURATION OF THE DEMOLITION. (3-5) DAYS