Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel117050080
JurisdictionTucson
City of Tucson ZoningC-3
Tucson WardWard 6
Tucson Downtown Incentive ZoneDowntown Infill Incentive District
Tucson Registered NeighborhoodPie Allen
Major Streets & Routes

Arterial or Collector

National Register Historic DistrictFourth Avenue Commercial Historic District
Structure on National Register of Historic Places

Contributing

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 440 N 4TH AV
Date - 12/22/2024 2:36 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL None

Rezoning Cases

Date - 12/22/2024 2:36 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-11-05 Downtown Links UOD UOD Closed 03/23/2011

Permits

Address: 440 N 4TH AV
Date - 12/22/2024 2:36 p.m.
Total Number Of Permits - (7)
Permit Status Apply Date Expired Date Unit Type Description
T02PL02279 FINAL 12/10/2002 06/21/2003 PLUMB GAS LINE:REPAIR
T03EL02246 WITHDRWN 11/14/2003 05/30/2004 ELECT UPGRADE:ELECTRIC 60AMP TO 200AMP
T03OT00097 C OF O 01/22/2003 09/16/2003 C-OF-O C OF O:FURNITURE REPAIR
T09OT01472 EXPIRED 07/17/2009 N/A PEDDLER Possible Peddler site - okay for extended hours
T21RW03088 FINAL 06/24/2021 07/29/2021 ROW (2) 5X5 BELLHOLES IN DIRT/BLKTOP FRONT TO REPAIR/REPLACE GAS LINE. CREWS WILL BE WORKING ON NORTH SIDE OF PROPERTY ON EAST 6TH STREET. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. PLACE “BUSINESS ACCESS” SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS.
T21RW04976 FINAL 11/10/2021 12/11/2021 ROW JOB ORDER CONTRACT FOR TRAFFIC SIGNAL AND STREET LIGHT CONSTRUCTION, CONTRACT NO. 181906-02 REPLACING OLD TRAFFIC WIRE WITH NEW WIRE. THIS IS A ONE DAY JOB. THIS IS AN EMERGENCY REQUEST FOR THE CITYH OF TUCSON AS THE INTERSECTION IS BADLY DAMAGED AND CAN BE HAZARDOUS TO FOOT AND VEHICULAR TRAVEL. SIDEWALK WILL BE AVAILABLE FOR PEDESTRIAN TRAVEL. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. COORDINATION WITH SUNLINK PERSONNEL REQUIRED TO RESOLVE ANY POSSIBLE CONFLICTS.
T21RW05067 FINAL 11/22/2021 12/26/2021 ROW 5X5 BELL HOLE ON ASPHALT/DIRT FRONT TO REPAIR/REPLACE GAS LINE. CREWS WILL BE WORKING ON NORTH SIDE OF PROPERTY ON EAST 6TH STREET AREA WILL BE CLOSED OFF FOR STREET FAIR ON DEC 10-12 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 5. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 6. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 7. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 8. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 9. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 10. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 11. MAINTAIN PEDESTRIAN ACCESS 12. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. 13. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813