Address Search: 4140 E SPEEDWAY BL
Search
Parcel Attributes
| Parcel | 126050510 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-2 |
| Tucson Ward | Ward 6 |
| Tucson Registered Neighborhood | Peter Howell |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 4140 E SPEEDWAY BL
Date - 08/17/2026 2:43 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 4140 E SPEEDWAY BL
Date - 08/17/2026 2:43 a.m.
Total Number Of Permits - (7)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T00EL00057 | EXPIRED | 01/07/2000 | 07/16/2000 | ELECT | UPGRADE:ELECTRIC 100 TO 200 AMP | |
| T03OT02111 | FINAL | 12/01/2003 | 10/10/2004 | SIGN | SIGN:6399 | |
| T06CM03035 | WITHDRWN | 05/22/2006 | N/A | COMBO | REPLACE LIGHT FIXTURE ON BILLBOARD | |
| T12OT01574 | FINAL | 11/20/2012 | 05/20/2013 | C-OF-O | Zoning Compliance | |
| T15BU00360 | WITHDRWN | 04/02/2015 | N/A | BUILD | BILLBOARD REPAIR (30 DAY REVIEW) | |
| T15BU00410 | FINAL | 04/14/2015 | 11/04/2015 | DEMO | BILLBOARD REMOVAL (10 DAY) | |
| T22RW02554 | FINAL | 07/18/2022 | 08/19/2022 | ROW | Replace leaking service on asphalt alley. 4140 E. Speedway Bl. 22R1566 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. Emergency – After the fact permit a MCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Tucson Water to address since DTM did not have an opportunity to review, approve or inspect work. |