Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Search

Parcel Attributes

Parcel13817004C
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 358 E ELVIRA RD
Date - 09/11/2026 12:10 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Special Development Requests & Requirements

Address: 358 E ELVIRA RD
Date - 09/11/2026 12:10 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000009345 CLOSED 01/03/2018 N/A Historical Information

Permits

Address: 358 E ELVIRA RD
Date - 09/11/2026 12:10 p.m.
Total Number Of Permits - (6)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TC-RES-0723-06635 Withdrawn 07/18/2023 05/18/2025 Residential Building - One or Two Family Manufactured Home (2) 9.5' x 21' bedroom units
TZ-PMT-0524-00032 Denied 05/21/2024 N/A Zoning Permit Annual FBB
TC-FBB-0524-00089 Void 05/14/2024 N/A Factory Built Buildings VOID: YL- Unable to process. This address has an existing permit. The scope of work falls within TC-RES-0723-06635 that is addressing Manufactured Home(2) 9.5' x 21' bedroom units. The permit is currently approved but not yet issued. Please be sure ALL pre-issuance conditions have been satisfied to have your permit issued and ready for inspection scheduling. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf For questions: Building_Official@tucsonaz.gov - affordable housing permanent modular
T06BU02357 FINAL 09/27/2006 01/13/2008 DEMO DEMOLITION:SFR
T16EX01949 EXPIRED 05/19/2016 07/22/2016 EXCAV SSAP ATLAS 0091 (22 LOCATIONS) - ABANDON/REPLACE/TIE OVER GAS LINES AT VARIOUS LOCATIONS. SEE ATTACHED SPREADSHEET FOR LOCATIONS. TCP - INTERIOR: ALL 1 DAY WORK WITHIN APPROVED TIME ON ANNUAL BLANKET PERMIT. T15TC01632 TCP ATTACHED FOR 100 E ELVIRA/7144 S 6TH AVE

Plans

Address: 358 E ELVIRA RD
Date - 09/11/2026 12:10 p.m.
Total Number Of Plans - (4)
Plan Number Status Application Date Exp Date Unit Type Description
TD-DIV-0524-00040 Needs Resubmittal 05/02/2024 N/A -- Subdivision/Plats APPLICANT INTENDS TO DIVIDE PARCEL INTO FIVE LOTS
TP-PRE-0926-00181 Fees Paid 09/02/2026 N/A -- Pre-Application Conference Pre-app request for a 3-lot minor subdivision
S07-065 EXPIRED 05/01/2007 06/02/2008 LOT SPLIT -- LSPT
T21PRE0226 CLOSED 10/19/2021 N/A NEIGHBORHOOD NOTIFICATION -- LABELS Site: Elvira Rental Community.