Address Search: 3431 S PANTANO RD
Search
Parcel Attributes
| Parcel | 136190160 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 4 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 3431 S PANTANO RD
Date - 08/20/2026 1:22 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 3431 S PANTANO RD
Date - 08/20/2026 1:22 p.m.
Total Number Of Permits - (6)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T00BU02246 | FINAL | 07/26/2000 | 01/22/2001 | BUILD | ADDITION:FRONT PORCH | |
| T02ME00651 | FINAL | 10/03/2002 | 04/07/2003 | MECH | REPLACE:FURANCE (APA) | |
| T08PL00598 | FINAL | 04/09/2008 | 02/11/2009 | PLUMB | RELOCATE: WATER METER (SFR) | |
| T17RW04756 | FINAL | 10/25/2017 | 11/27/2017 | ROW | (2) 5x5 IN DIRT ALLEY TO REPAIR/REPLACE GAS LINE | |
| T22RW01862 | FINAL | 05/17/2022 | 07/20/2022 | ROW | STA 13 +88.5' -98"rt WOOD POWER POLE TRANSFER EXISTING RISER TO NEW POLE. STA 13 +88.5'-102'RT STEEL POWER POLE NEW LOCATION OF EXISTING RISER ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. | |
| T99EL02630 | FINAL | 10/06/1999 | 04/04/2000 | ELECT | UPGRADE:ELECTRIC:125 TO 200 AMP |