Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 341 E 1ST ST
Search
Parcel Attributes
Parcel | 117020920 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | HR-2 |
Water Course | Washes |
Tucson Ward | Ward 6 |
Tucson Registered Neighborhood | West University |
National Register Historic District | West University Historic District |
Structure on National Register of Historic Places | Contributing |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 341 E 1ST ST
Date - 11/14/2024 5:41 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
Original Town Of Tucson | ORIGINAL | None |
Rezoning Cases
Date - 11/14/2024 5:41 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-83-49 | West University Historic District | HR-2 | Effectuated | 09/23/2010 |
Special Development Requests & Requirements
Address: 341 E 1ST ST
Date - 11/14/2024 5:41 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T17SA00252 | APPROVED | 06/12/2017 | N/A | Historic Preservation Zone |
Permits
Address: 341 E 1ST ST
Date - 11/14/2024 5:41 p.m.
Total Number Of Permits - (7)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T22CM07564 | Issued | 10/03/2022 | 09/13/2023 | Residential Building - One or Two Family | replace 5 ton split system & install new mini split | |
TC-RES-0824-04702 | Issued | 08/12/2024 | 02/18/2025 | Residential Building - One or Two Family | SFR and garage Roof Replacement and sheathing as required (Monaco Red) | |
TE-FPU-0224-00047 | Issued | 02/16/2024 | 06/15/2024 | Floodplain Use | Curb cut for Water harvesting project in West University Neighborhood with tree planting at three locations Excavating six street-side stormwater-harvesting basins, stabilizing basin banks with rock, drilling six 4-inch diameter curb cores in street curb, planting native trees and/or Tucson Basin-native understory vegetation in basin terraces and basin bottoms. Addresses of all work sites: 341 E. 1st Street, 1001 N. 3rd Avenue, 604 E. 1st Street NOTE: All sites have been bluestaked, and were field inspected by David Marhefka on 2-1-24 and APPROVED to proceed. | |
TR-ROW-0224-00149 | Complete | 02/09/2024 | 05/03/2024 | Right-of-Way (ROW) | West University Neighborhood rain and tree planting at three locations Excavating six street-side stormwater-harvesting basins, stabilizing basin banks with rock, drilling six 4-inch diameter curb cores in street curb, planting native trees and/or Tucson Basin-native understory vegetation in basin terraces and basin bottoms. Addresses of all work sites: 341 E. 1st Street, 1001 N. 3rd Avenue, 604 E. 1st Street NOTE: All sites have been bluestaked, and were field inspected by David Marhefka on 2-1-24 and APPROVED to proceed. | |
T00EL02433 | FINAL | 10/13/2000 | 11/28/2001 | ELECT | UPGRADE:ELECTRIC FROM 60AMP TO 200AMP | |
T03BU00511 | FINAL | 02/24/2003 | 11/17/2003 | POOL/SPA | POOL/SPA:GUNITE TD#15-19-46 | |
T17CM04554 | FINAL | 06/12/2017 | 12/12/2017 | COMBO | REPL ASPHALT SHINGLES |
Plans
Address: 341 E 1ST ST
Date - 11/14/2024 5:41 p.m.
Total Number Of Plans - (1)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
SD-0824-00075 | Complete | 08/14/2024 | N/A | -- Historic Preservation Zone/Historic Landmark | Whole house and garage roof shingles and materials to be removed. Install new underlayment, drip edge and IKO Dynasty Architectural shingles (Monaco Red). |
Record Requests
Address: 341 E 1ST ST
Date - 11/14/2024 5:41 p.m.
Total Number Of Requests - (1)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0424-02619 | Complete | 04/03/2024 | 04/03/2024 | Requests | I am requesting at 30-day this extension as work will take us two more weeks to work within the schedules of our contractors and the community plantings of the basins. West University Neighborhood rain and tree planting at three locations Excavating six street-side stormwater-harvesting basins, stabilizing basin banks with rock, drilling six 4-inch diameter curb cores in street curb, planting native trees and/or Tucson Basin-native understory vegetation in basin terraces and basin bottoms. Addresses of all work sites: 341 E. 1st Street, 1001 N. 3rd Avenue, 604 E. 1st Street NOTE: All sites have been bluestaked, and were field inspected by David Marhefka on 2-1-24 and APPROVED to proceed. |