Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Search

Parcel Attributes

Parcel13816024C
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 331 E ELVIRA RD
Date - 09/21/2026 4:46 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Permits

Address: 331 E ELVIRA RD
Date - 09/21/2026 4:46 p.m.
Total Number Of Permits - (38)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TC-COM-0425-00753 Complete 04/15/2025 08/04/2026 UNIT 2 Commercial Building Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
TC-COM-0425-00754 Approved 04/15/2025 08/04/2026 UNIT 3 Commercial Building Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
TC-COM-0425-00756 Expired 04/15/2025 08/04/2026 UNIT 4 Commercial Building Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
TC-COM-0425-00758 Complete 04/15/2025 08/10/2026 UNIT 5 Commercial Building Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
TC-COM-0425-00759 Expired 04/15/2025 07/28/2026 UNIT 6 Commercial Building Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
TC-COM-0425-00760 Inspections 04/15/2025 07/28/2026 UNIT 7 Commercial Building Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
TC-COM-0425-00761 Complete 04/15/2025 08/04/2026 UNIT 8 Commercial Building Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
TC-COM-0425-00677 Expired 04/07/2025 08/04/2026 UNIT 1 Commercial Building Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
T02AN00790 ISSUED 08/23/2002 N/A ADDRNEW
T04BU02741 FINAL 11/08/2004 01/10/2006 #05 SPKLR FIRE SPKR:ADD 10
T04BU02742 FINAL 11/08/2004 01/10/2006 #06 SPKLR FIRE SPKR:ADD 10
T04BU02743 FINAL 11/08/2004 01/10/2006 #07 SPKLR FIRE SPKR:ADD 10
T04BU02744 FINAL 11/08/2004 01/10/2006 #08 SPKLR FIRE SPKR:ADD 10
T04CM03252 FINAL 07/14/2004 09/25/2005 #03 COMBO DUPLEX:TD#15-74-61
T04CM03253 FINAL 07/14/2004 09/25/2005 #01 COMBO DUPLEX:TD#15-74-61
T04CM03254 FINAL 07/14/2004 09/25/2005 #05 COMBO DUPLEX:TD#15-74-61
T04CM03255 FINAL 07/14/2004 09/25/2005 #07 COMBO DUPLEX:TD#15-74-61
T04EX01152 CLOSED 12/14/2004 02/12/2005 EXCAV EXCAV:INSTALL SEWER 50LF
T04OT00938 EXPIRED 05/11/2004 01/09/2005 SITE SITE:4 DUPLEXES
T04PL01616 FINAL 09/07/2004 10/26/2005 PLUMB PRIVATE SEWER