Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 3249 N FREEWAY
Search
Permits
Address: 3249 N FREEWAY
Date - 12/23/2024 2:31 p.m.
Total Number Of Permits - (8)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-UTL-1222-00403 | Complete | 12/09/2022 | 03/30/2023 | Right-of-Way (ROW) - Utility | WO T20964. TEP will be replacing 1 pole and removing 7 poles along Fort Lowell rd going west to the Diamond St loop path. There will be no sidewalk impact. | |
DP22-0203 | Awaiting Submittal | 07/22/2022 | N/A | Development Package | GRADING - Prince 10, Phase 2. General site cleanup/grubbing and stockpiling fill. | |
TD-DEV-0524-00158 | Issued | 05/24/2024 | 07/31/2027 | Development Package | Development Plan for Prince 10 North Obelisk Structure only | |
TC-COM-0424-00614 | Issued | 04/05/2024 | 03/10/2025 | Commercial Building | Monument Entry Art. 50' stainless steel steel obelisk with 9.5' square footer | |
TR-UTL-0323-01156 | Issued | 03/23/2023 | 09/02/2023 | Right-of-Way (ROW) - Utility | WO T20964 (Permit already approved on TR-UTL-1222-00403 but expiring soon). TEP will be replacing 1 pole and removing 7 poles along Fort Lowell rd going west to the Diamond St loop path. There will be no sidewalk impact. | |
TR-UTL-0223-00892 | Needs Resubmittal | 02/16/2023 | N/A | Right-of-Way (ROW) - Utility | Installation of Primary Electric Feeder (TEP) joint trench with communications for the Prince 10 Planned Area Development (PAD 43). | |
TR-UTL-0223-00893 | Complete | 02/16/2023 | 10/22/2023 | Right-of-Way (ROW) - Utility | Installation of 12" Water Main (Tucson Water) for the Prince 10 Planned Area Development (PAD 43). ROW Permit is for one road crossing at Ft Lowell, west of the I-10 Frontage Road. | |
TR-ROW-0223-00318 | Complete | 02/01/2023 | 10/19/2024 | Right-of-Way (ROW) | Requesting an extension to the existing road closure permit on La Cholla/Ft Lowell extending to the frontage Rd. I applied for this extension in early October by email. Updated - 7/18/2024 Request for 90 day extension.. |