Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Permits

Address: 321 N 4TH AV
Date - 12/24/2024 6:35 p.m.
Total Number Of Permits - (5)
Permit Status Apply Date Expired Date Unit Type Description
T19RW07353 Complete 12/03/2019 06/06/2020 Right-of-Way Small Wireless INSTALL NEW STREET LIGHT POLE TO MATCH CITY OF TUCSON LOOK AND DESIGN THAT WILL ALLOW FOR WIRELESS C; Work Order: TUC LOGAN 3 SC
TZ-PMT-0824-00059 Needs Resubmittal 08/29/2024 N/A Zoning Permit Annual We have been serving Tucson’s best BBQ at 4th and 8th in front of The Hut for almost 5 years. Due to a new transportation amendment, we need to relocate and apply for an expensive new permit and approval . We are now wanting to move to 4th and 7th, next to Che's Lounge, which avoids the need for building owner approval. We remain dedicated to delivering exceptional BBQ and are ready to tackle this new challenge. NOTE: Special exception will be required for this permit for the extended hours of 11PM to 3AM
TC-COM-0723-01720 Fees Paid 07/17/2023 01/13/2024 Commercial Building EXTENDING GAS LINE ON WALL FROM EXISTING METER LOCATION TO NEW METER LOCATION
T20RW00324 WITHDRWN 01/21/2020 N/A ROW WATER MAIN RELOCATION - APPROXIMATELY 310LF ALONG NORTH HERBERT AVE. OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROL AND WORKERS.
T20RW00325 FINAL 01/21/2020 02/29/2020 ROW Starting at TEP pole on the East side of Herbert and 6th St Riser up and Overlash 135' going South,Riser down and Trench/bore 250' going South,Pull thru existing 251', Riser up and Overlash 524' going South.Riser down and trench/bore going East 220' continue North 80' to Cox Vault. ADDRESS ON APPLICATION IS 321 N. 4TH AV. WORK STARTS ON HERBERT AV NORTH OF 6TH ST NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. 6TH ST and 4TH AV was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. YOU WILL HAVE TO NOTIFY PARK TUCSON 24 HOURS BEFORE WORK, AT:520-791-5071 BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 SUNLINK APPROVED: 01/29/2020 AT 7:00 AM TO 02/03/2020 TILL 4:00 PM A FLAGGER IS REQUIRED AS NEEDED