Address Search: 32 W SAHUARO ST
Search
Special Development Requests & Requirements
Address: 32 W SAHUARO ST
Date - 11/10/2026 12:47 p.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000012614 | CLOSED | 12/11/2020 | N/A | Historical Information |
Permits
Address: 32 W SAHUARO ST
Date - 11/10/2026 12:47 p.m.
Total Number Of Permits - (6)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T00EL00621 | FINAL | 03/13/2000 | 11/07/2000 | ELECT | UPGRADE:ELECTRIC 30 AMP TO 100 AMP | |
| T06CM03106 | WITHDRWN | 05/24/2006 | N/A | COMBO | ADD: PREFAB UNIT ART STUDIO | |
| T08EX00262 | CLOSED | 03/24/2008 | 05/23/2008 | EXCAV | EXTEND 8' CURB CUT | |
| T21CM09220 | FINAL | 11/29/2021 | 02/06/2023 | COMBO | 200 amp Panel upgrade | |
| T21RW05338 | FINAL | 12/20/2021 | 01/21/2022 | ROW | (1) 5'X5' BELL HOLE IN DIRT ROW TO ABANDON GAS LINE. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
| T22RW01853 | FINAL | 05/17/2022 | 06/25/2022 | ROW | TRENCHING APPROX. 40 LF FOR TUCSON ELECTRIC POWER FROM PROPERTY LINE TO ELECTRICAL POLE. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |