Address Search: 3098 N SILVERBELL RD
Search
Permits
Address: 3098 N SILVERBELL RD
Date - 11/23/2024 6:11 p.m.
Total Number Of Permits - (13)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
DP20-0141 | Issued | 07/13/2020 | 04/21/2021 | Development Package | SITE/FLOODPLAIN - Air Sparge Treatment System, Silvercroft Wash Release Site, sanitation system. (Ow | |
T20CM03944 | Expired | 06/24/2020 | 12/27/2021 | Commercial Building | NEW AIR SPARGE TREATMENT SYSTEM | |
T22RW01944 | Issued | 05/20/2022 | 02/17/2023 | Right-of-Way (ROW) | TRENCH 60’L X 4’D x 2’W IN THE RIGHT-OF-WAY FOR NEW WATER LINE FOR THE WEST BRIDGE AT SILVERBELL DEVELOPMENT PROJECT, PIA NO. T22PI00009, PLAN NO. I-2021-007 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | |
TR-UTL-0223-00758 | Issued | 02/02/2023 | 04/23/2023 | Right-of-Way (ROW) - Utility | TRENCH 60’L X 4’D x 2’W IN THE RIGHT-OF-WAY FOR NEW WATER LINE FOR THE WEST BRIDGE AT SILVERBELL DEVELOPMENT PROJECT, PIA NO. T21PI00009, PLAN NO. I-2021-007 | |
T07AN00205 | ISSUED | 03/07/2007 | N/A | ADDRNEW | ||
T15EX02466 | FINAL | 08/18/2015 | 10/18/2015 | EXCAV | TRENCH 10' FROM EXISTING POLE TO NEW POLE TO EXTEND CONDUIT AND TO CLEAR EXISTING POLE FOR REMOVAL. ALSO, TRANSFER EXISTING FIBER CABLE FROM OLD POLE TO NEW LEAD POLE TO ALLOW FOR EXISTING POLES TO BE REMOVED. WORK ORDER # N.010885 | |
T15EX02618 | FINAL | 09/01/2015 | 10/31/2015 | EXCAV | RELOCATE EXISTING SPRINT FIBER IN ORDER TO ALLEVIATE CONFLICTS WITH THE CITY OF TUCSON PROJECT BEING CONSTRUCTED BY HUNTER CONSTRUCTION. PLAN #1-2012-013 JOB #SR6A CONTRACT #151120 "SILVERBELL ROAD-GORET RD TO GRANT ROAD IMPROVEMENTS. WORKING WITHIN HUNTER CONSTRUCTION TCP/BARRICADES JOE CHASE-PROJECT MANAGER 837-6619 | |
T15TC01909 | FINAL | 08/18/2015 | N/A | BARRICAD | TRENCH 10' FROM EXISTING POLE TO NEW POLE TO EXTEND CONDUIT AND TO CLEAR EXISTING POLE FOR REMOVAL. ALSO, TRANSFER EXISTING FIBER CABLE FROM OLD POLE TO NEW LEAD POLE TO ALLOW FOR EXISTING POLES TO BE REMOVED. WORK ORDER # N.010885 | |
T20CFW0069 | FINAL | 11/19/2020 | 02/15/2022 | FIREWRKS | PHANTOM FIREWORKS 12-27-12/31/2020 SALES OF CFW | |
T20FO00620 | FINAL | 11/19/2020 | 12/02/2021 | FIREOPER | 1 TENT CHRISTMAS TREE SALE AND CFW 11/27-12/31/2020 | |
T21RW02591 | VOID | 05/26/2021 | N/A | ROW | WO 2105839- 2500 W Goret rd in center of intersection of Silverbell Rd and Goret Rd valve box and concrete collar installed. ADDRESS ON APPLICATION: 2500 W GORET RD. NOTE: WORK IS IN THE INTERSECTION OF N SILVERBELL RD AND W GORET RD - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY NOTE: N Silverbell Rd and W Goret Rd are under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW02704 | FINAL | 06/03/2021 | 07/09/2021 | ROW | REPAIR 30'X12' IN NORTHBOUND LEFT TURN LANE OF N SILVERBELL RD AT THE INTERSECTION OF W GORET RD. LEFT HAND TURN RESTRICTION NORTHBOUND AND THROUGH TRAVEL LANE RESTRICTION EASTBOUND ON W GORET RD. Replacing a Tucson Water valve box and concrete collar. No pavement cuts will be performed. | |
T21RW04539 | FINAL | 10/06/2021 | 02/19/2022 | ROW | INSTALLATION OF MANHOLE OVER EXISTING 42" WATERMAIN FOR MAINTENANCE INSPECTION FOR TUCSON WATER ADDRESS ON APPLICATION: N SILVERBELL & W GORET INTERSECTION PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. NOTE: SILVERBELL RD IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. ** POTENTIAL CONFLICT WITH EL TOUR DE TUCSON BIKE ROUTE SCHEDULED FOR NOVEMBER 18-20. AREA MUST BE BARRIER AND DEBRIS FREE IN AND AROUND SURROUNDING PROJECT SITE. ROADWAY MUST BE SMOOTH AS TO NOT INTERFERE WITH BICYCLIST TRAVEL. ** |
Code Enforcement
Address: 3098 N SILVERBELL RD
Date - 11/23/2024 6:11 p.m.
Total Number Of Code Cases - (1)
Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO1023-06219 | Closed - Resolved | 10/25/2023 | 10/30/2023 | RWOP- Contractors starting work well before the ordinance allows and they don’t have an exemption. They have starting between 5:00am & 6am consistently even after numerous complaints to the project manager of the development with Mattamy Homes. The ordinance is clear that they can’t start before sunrise and they do but they have to have an exemption to do so. |
Record Requests
Address: 3098 N SILVERBELL RD
Date - 11/23/2024 6:11 p.m.
Total Number Of Requests - (1)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-1222-00330 | Complete | 12/06/2022 | 12/29/2022 | Requests | TRENCH 60’L X 4’D x 2’W IN THE RIGHT-OF-WAY FOR NEW WATER LINE FOR THE WEST BRIDGE AT SILVERBELL DEV |