Address Search: 3000 S COTTONWOOD LN
Search
Parcel Attributes
| Parcel | 11921031E |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 1 |
| Flood Related Information | FEMA Floodplain Area |
| Tucson Registered Neighborhood | Santa Cruz Southwest |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 3000 S COTTONWOOD LN
Date - 10/16/2026 12:55 a.m.
Total Number Of Annexations & Original City Zoning (2)
Permits
Address: 3000 S COTTONWOOD LN
Date - 10/16/2026 12:55 a.m.
Total Number Of Permits - (15)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T18EL00279 | Approved | 10/16/2018 | N/A | 01 | Residential Building - One or Two Family | Installation of Solar PV 36-Panel 360W Ground Mount System |
| TE-FPU-0826-00340 | Issued | 08/23/2026 | N/A | Floodplain Use | FPUP to be connected to TR-UTL-0626-1007. Floodplain Use Permit for the replacement of a single power pole (Pole 108) within an Zone AE Floodplain (Old West Branch of Santa Cruz River). | |
| TR-UTL-0626-01007 | Issued | 06/17/2026 | 12/28/2026 | Right-of-Way (ROW) - Utility | WO T179178 - REPLACING 1 POLE | |
| TR-UTL-0526-00857 | Issued | 05/20/2026 | 10/09/2026 | Right-of-Way (ROW) - Utility | WO T90276 - Completing a riser; working inside a pull box; pulling in underground cable 09/01/26 - Request for 30 Day Renewal as of 09/09/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts. | |
| P98AN02622 | ISSUED | 10/16/1998 | N/A | #01 | ADDRNEW | |
| T00PL02117 | FINAL | 11/08/2000 | 05/08/2001 | PLUMB | GAS LINE:REPLACEMENT | |
| T05EL00639 | FINAL | 04/01/2005 | 10/04/2005 | ELECT | RECCONECT: ELEC METER | |
| T16EX00399 | FINAL | 02/08/2016 | 04/08/2016 | EXCAV | (2) 5x5 IN DIRT ON WEST SIDE OF PROPERTY TO RELOCATE GAS LINE - LANE REQUEST IS FOR 1/8/16 | |
| T18CM08515 | FINAL | 10/24/2018 | 10/05/2019 | #01 | COMBO | SOLAR INSTALL |
| T18OT01215 | FINAL | 11/27/2018 | N/A | FLOODPLN | FUP FOR T18CM08515 | |
| T19CM01194 | FINAL | 02/19/2019 | 08/27/2019 | #02 | COMBO | E- EXTEND POLE HEIGHT PER TEP REQUIREMENT |
| T19EL00049 | WITHDRWN | 02/13/2019 | N/A | #01 | ELECT | Electrical Pole Extension Need to Increase Existing Electric Pole height from 12' to 15' |
| T19RW06386 | FINAL | 10/22/2019 | 12/25/2019 | ROW | Transfer 1 cable attachment, 1 aerial service drop and 1 pole mounted terminal. Remove 10ft of BSW. Remove and install 1 pole tag. Install 1 cable tag. Pull old pole. | |
| T20CM06442 | FINAL | 09/19/2020 | 03/27/2021 | #02 | COMBO | ELECTRICAL RECONNECT |
| T20RW02403 | FINAL | 04/28/2020 | 03/30/2021 | ROW | TEP to replace 3 poles for voltage conversion |