Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 2800 E AJO WY
Search
Annexations & Original City Zoning (OCZ)
Address: 2800 E AJO WY
Date - 12/22/2024 9:30 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 12/22/2024 9:30 p.m.
Total Number Of Rezone Cases - (7)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-80-48 | Leewood Nursing Home - Country Club Road | R-4 | Effectuated | 02/16/2011 |
C9-81-71 | Kino Hospital - Ajo Way | R-3 | Effectuated | 01/13/2011 |
C9-82-66 | Pima County - Ajo Way | P-I | Effectuated | 09/16/2010 |
C9-84-59 | Nicholas - Michigan Street | I-1 | Expired | 07/08/2010 |
C9-85-94 | Downey - I-10 | B-2 | Expired | 05/26/2010 |
C9-86-29 | La Colina Health Care - Country Club Road | R-4 | Expired | 03/04/2010 |
C9-09-02 | Kino Health Campus PAD-Ajo Way | PAD | Closed | 01/21/2009 |
Special Development Requests & Requirements
Address: 2800 E AJO WY
Date - 12/22/2024 9:30 p.m.
Total Number Of Special Development Permits - (2)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000001228 | CLOSED | 11/03/2008 | N/A | Historical Information | ||
T15SA00015 | COMPLETE | 01/15/2015 | N/A | Zoning Adminstration Letter |
Permits
Address: 2800 E AJO WY
Date - 12/22/2024 9:30 p.m.
Total Number Of Permits - (75)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-1224-01413 | In Review | 12/10/2024 | N/A | Right-of-Way (ROW) | Message Board and traffic control for the 2025 Gem Show. | |
TF-FCP-1122-00121 | Complete | 11/18/2022 | N/A | Fire Construction Permit | Replace 8 Sprinkler Heads that failed inspection. | |
TF-FOP-1124-01313 | Complete | 11/12/2024 | 12/19/2025 | Fire Operational Permit | Flammable and combustible liquid | |
TF-FOP-1124-01314 | Complete | 11/12/2024 | 12/19/2025 | Fire Operational Permit | Compressed Gases | |
TF-FOP-1024-01246 | Complete | 10/31/2024 | 12/19/2025 | Fire Operational Permit | Banner South Hospital 245 beds and suites 100, 200, 300, 500, BHP, Central Plant | |
T22FO00909 | Complete | 10/18/2022 | 08/10/2023 | Fire Operational Permit | State Lic Facls Annual Insp - BUILDING 200 SUITE 201 - BANNER PHYSICAL THERAPY; State Licensed - Other | |
TF-FOP-1023-01667 | Complete | 10/17/2023 | 10/24/2024 | Fire Operational Permit | Needed for the Banner Physical Therapy clinic located in Suite 200 | |
TR-ROW-1024-01202 | Needs Resubmittal | 10/14/2024 | N/A | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Country Club and Country Club and Irvington. | |
TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. | |
T22RW03601 | Complete | 10/03/2022 | 12/09/2022 | Right-of-Way (ROW) | TRAFFIC CONTROL ALONG AJO WAY AND COUNTRY CLUB RD FOR ADVANCE WARNING OF MILLING & PAVING OR SEAL CO; Work Order: 413-03 | |
T22CM07200 | Inspections | 09/20/2022 | 03/18/2025 | 201 | Commercial Building | interior fit-out for outpatient PT clinic |
TF-FCP-0824-00698 | Complete | 08/21/2024 | 03/03/2025 | Fire Construction Permit | addition to existing fire alarm system requesting paper permit | |
T17FC00379 | Expired | 05/08/2017 | 05/12/2018 | Fire Construction Permit | Automatic Fire Extingshing Sys - Install new pendant fire sprinklers to accommodate tenant improvement; Commercial Fire Sprinkler Systems - Modification of heads: 130 | |
TF-FOP-0423-00915 | Complete | 04/20/2023 | 04/20/2023 | Fire Operational Permit | Banner University Medical Center South Campus Hospital I-2 245 Beds | |
TC-COM-0324-00557 | Complete | 03/28/2024 | 11/16/2024 | Commercial Building | Replace existing slab for Mobile PET Scanner | |
TR-UTL-0324-00588 | Complete | 03/22/2024 | 07/23/2024 | Right-of-Way (ROW) - Utility | PRJ267305-1- Cox to pull 3100ft of fiber thru existing conduit, pothole for new pedestal & intercept existing. | |
TR-UTL-0224-00323 | Void | 02/14/2024 | N/A | Right-of-Way (ROW) - Utility | (Denied - Work Area Show is Located outside of City of Tucson Right of Way ) EMG 2746220 2800 E AJO WY 14-14-32NE repaired leaking main at intersection S.Forgeus Ave and E.President St in street ; 6lf asphalt/MLM | |
T00ME00377 | FINAL | 04/14/2000 | 10/07/2000 | MECH | PRESSURE VESSEL CERTIFICATE:TUC-23296,23293,23292,23294,23297,23299,23295,23246,23245,23298 | |
T00ME00735 | FINAL | 06/26/2000 | 12/23/2000 | MECH | PRESSURE VESSEL CERT:TUC-23302-23301-23300-23305- | |
T02EX00658 | CLOSED | 06/04/2002 | 08/03/2002 | EXCAV | EXCAV:60LF CURB RETURNS/RAMPS | |
T03OT01053 | WITHDRWN | 06/11/2003 | N/A | C-OF-O | C OF O:DENTAL CLINIC | |
T06BU00032 | EXPIRED | 01/09/2006 | 08/07/2006 | SPKLR | RELOCATE 4 FIRE SPRINKLERS | |
T06BU02971 | FINAL | 12/20/2006 | 09/11/2007 | SPKLR | ADD 177 NEW FIRE SPRINKLERS | |
T07BU00053 | FINAL | 01/09/2007 | 07/10/2007 | SPKLR | FIRE SPRINKLER:208 FEET NEW 4"UNDERGROUND | |
T08BU01659 | FINAL | 09/12/2008 | 04/06/2009 | SPKLR | Add 26 fire sprinkler heads. | |
T09BU00588 | FINAL | 04/21/2009 | 04/18/2010 | SPKLR | Add 22, relocate 6 fire sprinklers | |
T09BU01109 | FINAL | 07/29/2009 | 03/10/2010 | BUILD | FIRE ALARM | |
T09BU01182 | FINAL | 08/11/2009 | 05/09/2010 | BUILD | REPLACE: EXISTING FIRE ALARM CONTROL PANEL AND FIELD DEVICES | |
T09BU01482 | FINAL | 10/01/2009 | 11/09/2010 | SPKLR | Relocate 2 fire sprinklers | |
T10BU00311 | FINAL | 02/19/2010 | 11/09/2010 | SPKLR | Add 2 fire sprinklers | |
T10BU00947 | FINAL | 06/11/2010 | 02/27/2011 | SPKLR | Add 1 fire sprinkler | |
T11BU01323 | FINAL | 10/11/2011 | 04/10/2012 | TENTS | 40' x 80' TENT | |
T11EX00286 | CLOSED | 06/14/2011 | 08/13/2011 | EXCAV | DIRT TRENCH 550' FROM POWER POLE AT SW CORNER OF COUNTRY CLUB/AJO TO MANHOLE IN DRIVEWAY TO PLACE COX CONDUIT | |
T11EX00329 | CLOSED | 07/06/2011 | 09/04/2011 | EXCAV | TRENCHING IN RIGHT OF WAY TO PLACE TIME WARNER FACILITIES | |
T16TC00925 | FINAL | 04/15/2016 | N/A | BARRICAD | Begin at thesoutheast corner of Ajo Way and Country Club hang 165' of 625 coax cable heading south and then onto private property 41520150000CTU0317 | |
T17FC00570 | FINAL | 07/13/2017 | 03/27/2018 | FIRECONS | Modify Existing Wet Pipe Fire Sprinkler - *** No Plans *** | |
T17FC00718 | FINAL | 08/30/2017 | 09/17/2018 | FIRECONS | MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM | |
T18CM05260 | L OF C | 07/06/2018 | 02/16/2020 | COMBO | TI: CREATE MEDICAL OFFICES IN EXISTING BUILDING | |
T18CM06526 | EXPIRED | 08/20/2018 | 05/18/2019 | COMBO | 3 NEW STEEL CARPORTS | |
T19CM00068 | FINAL | 01/04/2019 | 06/02/2020 | COMBO | E- REMODEL EXISTING COMPOUND PHARMACY | |
T19FC00482 | FINAL | 06/20/2019 | 07/01/2020 | FIRECONS | 3RD FLOOR TENANT IMPROVEMENT | |
T19FC00532 | FINAL | 07/11/2019 | 01/29/2020 | FIRECONS | *** N0 PLANS *** Relocate Two Sprinkler Heads | |
T19FC00534 | FINAL | 07/11/2019 | 01/29/2021 | FIRECONS | 2nd Floor - Pharmacy - TI - Add one Speaker Strobe to existing system | |
T19RW06230 | FINAL | 10/18/2019 | 11/25/2019 | ROW | INSTALLATION OF SMALL CELL EQUIPMENT MOUNTED ON EXISTING COX STRAND ON NORTH SIDE OF 2800 E AJO WAY | |
T20RW03608 | VOID | 06/25/2020 | 10/01/2020 | ROW | PLACE AERIAL CABLE AND STRAND FOR 82' AND PLACE 1 DOWN GUY AND ANCHOR FOR TUC30_025 ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. | |
T21FO00704 | FINAL | 10/14/2021 | 05/30/2022 | FIREOPER | 245 BEDS | |
T21FO00890 | FINAL | 12/20/2021 | 07/19/2022 | FIREOPER | HOSPITAL OPERATIONS | |
T21FO00891 | FINAL | 12/20/2021 | 07/19/2022 | FIREOPER | HOSPITAL OPERATIONS | |
T98ME00276 | FINAL | 04/27/1998 | 08/09/1998 | MECH | PRESSURE VESSEL CERTIFICATE:TUC-20054,20050 | |
T98ME00422 | FINAL | 06/05/1998 | 11/22/1998 | MECH | PRESSURE VESSEL CERTIFICATE:TUC-20049 | |
T99ME00215 | FINAL | 02/18/1999 | 08/10/1999 | MECH | PRESSURE VESSEL CERTIFICATE:TUC-20054,20050 | |
T99ME00717 | FINAL | 07/02/1999 | 12/15/1999 | MECH | PRESSURE VESSEL CERTIFICATE:TUC-20049 | |
TUC-20049 | CERTIFIC | 05/23/1997 | 06/17/2000 | VESSEL | ||
TUC-20050 | CERTIFIC | 05/23/1997 | 02/11/2000 | VESSEL | ||
TUC-20054 | CERTIFIC | 05/27/1997 | 02/11/2000 | VESSEL | ||
TUC-21475 | RENEWAL | 06/23/1997 | 05/31/1988 | VESSEL | ||
TUC-21511 | CERTIFIC | 06/09/1997 | 06/01/1986 | VESSEL | ||
TUC-21657 | RENEWAL | 07/14/1997 | 06/01/1986 | VESSEL | ||
TUC-23245 | CERTIFIC | 04/12/2000 | 04/10/2003 | VESSEL | ||
TUC-23246 | CERTIFIC | 04/12/2000 | 04/10/2003 | VESSEL | ||
TUC-23292 | CERTIFIC | 06/20/1997 | 04/10/2003 | VESSEL | ||
TUC-23293 | CERTIFIC | 06/20/1997 | 04/10/2003 | VESSEL | ||
TUC-23294 | CERTIFIC | 06/20/1997 | 04/10/2003 | VESSEL | ||
TUC-23295 | CERTIFIC | 06/20/1997 | 04/10/2003 | VESSEL | ||
TUC-23296 | CERTIFIC | 06/20/1997 | 04/10/2003 | VESSEL | ||
TUC-23297 | CERTIFIC | 06/20/1997 | 04/10/2003 | VESSEL | ||
TUC-23298 | CERTIFIC | 06/20/1997 | 04/10/2003 | VESSEL | ||
TUC-23299 | CERTIFIC | 06/20/1997 | 04/10/2003 | VESSEL | ||
TUC-23300 | CERTIFIC | 06/20/1997 | 05/22/2003 | VESSEL | ||
TUC-23301 | CERTIFIC | 06/20/1997 | 05/22/2003 | VESSEL | ||
TUC-23302 | CERTIFIC | 06/20/1997 | 05/22/2003 | VESSEL | ||
TUC-23305 | CERTIFIC | 06/20/1997 | 05/22/2003 | VESSEL | ||
TUC-23307 | CERTIFIC | 06/20/1997 | 05/22/2003 | VESSEL | ||
TUC-23308 | CERTIFIC | 06/20/1997 | 05/22/2003 | VESSEL | ||
TUC-23310 | RENEWAL | 06/20/1997 | 05/22/2003 | VESSEL |
Record Requests
Address: 2800 E AJO WY
Date - 12/22/2024 9:30 p.m.
Total Number Of Requests - (3)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0323-01689 | Complete | 03/20/2023 | 04/09/2023 | Requests | interior fit-out for outpatient PT clinic |
REQ-0524-03829 | Complete | 05/22/2024 | 05/22/2024 | Requests | interior fit-out for outpatient PT clinic |
REQ-1124-07506 | Complete | 11/05/2024 | 11/05/2024 | Requests | Replace existing slab for Mobile PET Scanner |