| Parcel | 107130310 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-2 |
| Tucson Ward | Ward 3 |
| Tucson Registered Neighborhood | Keeling |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 2736 N STONE AV
Date - 10/20/2026 9:05 p.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 2736 N STONE AV
Date - 10/20/2026 9:05 p.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000013082 | CLOSED | 12/29/2021 | N/A | Historical Information |
Permits
Address: 2736 N STONE AV
Date - 10/20/2026 9:05 p.m.
Total Number Of Permits - (8)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0226-00223 | Inspections | 02/06/2026 | 08/03/2026 | Right-of-Way (ROW) - Utility | Zayo Contractor ADB Companies to install conduit/fiber via Directional Bore and open trench for an estimated 5,283 LF. Zayo Handholes to be installed every 2,000 LF for future access and maintenance. 04/20/2026 - Request for 90 Day Renewal as of 05/05/2026 | |
| P99AN03727 | ISSUED | 12/20/1999 | N/A | #01 | ADDRNEW | |
| T18CM06724 | FINAL | 08/24/2018 | 07/22/2019 | #01 | COMBO | NEW ELECTRICAL SERVICE & NEW HVAC |
| T18CM06725 | FINAL | 08/24/2018 | 12/14/2020 | #02 | COMBO | NEW ELECTRICAL SERVICE & NEW HVAC |
| T19CM00585 | FINAL | 01/28/2019 | 08/14/2019 | COMBO | GAS RECONNECT PERMIT FOR 2 METERS | |
| T20RW02635 | FINAL | 05/08/2020 | 08/01/2021 | ROW | FTIR (2020) - ATLAS 0012, STONE AVENUE.M WR 3995841. - REPLACE 2,993 LF IN CITY RIGHT OF WAY (2,204 LF VIA TRENCHING/BORING IN PAVEMENT; 304 LF VIA TRENCHING/BORING IN DIRT) BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. STONE AV IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. CONTACT PROJECT MANAGER, SANTIAGO LOZANO, AT 520-780-8853 PRIOR TO WORKING IN THE AREA OF STONE/GRANT. | |
| T20RW02885 | FINAL | 05/20/2020 | 06/21/2020 | ROW | POTHOLE NEEDED TO COMPLETE LOCATE. 2 5X5 BELLHOLES IN CONCRETE SIDEWALK / BLACK TOP TO POTHOLE GAS LINE. | |
| T20RW03007 | FINAL | 05/27/2020 | 06/27/2020 | ROW | TEP WILL BE INSTALLING (1) POLE AND APPROX 60' OF OVERHEAD CONDUCTOR IN THE ROW A 2'X2' HOLE 6' DEEP WILL BE BACKFILLED WITHOUT SIDEWALK IMPACT |