Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel107130310
JurisdictionTucson, Pima County
City of Tucson ZoningC-2
Tucson WardWard 3
Tucson Registered NeighborhoodKeeling
Major Street & Route

Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 2736 N STONE AV
Date - 10/20/2026 9:05 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-59-19 North To Roger Rd. And East To Kolb Rd. 1895 1957

Special Development Requests & Requirements

Address: 2736 N STONE AV
Date - 10/20/2026 9:05 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000013082 CLOSED 12/29/2021 N/A Historical Information

Permits

Address: 2736 N STONE AV
Date - 10/20/2026 9:05 p.m.
Total Number Of Permits - (8)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-0226-00223 Inspections 02/06/2026 08/03/2026 Right-of-Way (ROW) - Utility Zayo Contractor ADB Companies to install conduit/fiber via Directional Bore and open trench for an estimated 5,283 LF. Zayo Handholes to be installed every 2,000 LF for future access and maintenance. 04/20/2026 - Request for 90 Day Renewal as of 05/05/2026
P99AN03727 ISSUED 12/20/1999 N/A #01 ADDRNEW
T18CM06724 FINAL 08/24/2018 07/22/2019 #01 COMBO NEW ELECTRICAL SERVICE & NEW HVAC
T18CM06725 FINAL 08/24/2018 12/14/2020 #02 COMBO NEW ELECTRICAL SERVICE & NEW HVAC
T19CM00585 FINAL 01/28/2019 08/14/2019 COMBO GAS RECONNECT PERMIT FOR 2 METERS
T20RW02635 FINAL 05/08/2020 08/01/2021 ROW FTIR (2020) - ATLAS 0012, STONE AVENUE.M WR 3995841. - REPLACE 2,993 LF IN CITY RIGHT OF WAY (2,204 LF VIA TRENCHING/BORING IN PAVEMENT; 304 LF VIA TRENCHING/BORING IN DIRT) BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. STONE AV IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. CONTACT PROJECT MANAGER, SANTIAGO LOZANO, AT 520-780-8853 PRIOR TO WORKING IN THE AREA OF STONE/GRANT.
T20RW02885 FINAL 05/20/2020 06/21/2020 ROW POTHOLE NEEDED TO COMPLETE LOCATE. 2 5X5 BELLHOLES IN CONCRETE SIDEWALK / BLACK TOP TO POTHOLE GAS LINE.
T20RW03007 FINAL 05/27/2020 06/27/2020 ROW TEP WILL BE INSTALLING (1) POLE AND APPROX 60' OF OVERHEAD CONDUCTOR IN THE ROW A 2'X2' HOLE 6' DEEP WILL BE BACKFILLED WITHOUT SIDEWALK IMPACT