Address Search: 2700 E BILBY RD
Search
Parcel Attributes
| Parcel | 14027038B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street |
| City of Tucson Zoning | P-I, I-1 |
| Tucson Ward | Ward 5 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 2700 E BILBY RD
Date - 11/03/2026 10:39 p.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 2700 E BILBY RD
Date - 11/03/2026 10:39 p.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000004395 | CLOSED | 10/29/2012 | N/A | 200 | Historical Information |
Permits
Address: 2700 E BILBY RD
Date - 11/03/2026 10:39 p.m.
Total Number Of Permits - (30)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0623-01859 | Withdrawn | 06/23/2023 | N/A | Right-of-Way (ROW) - Utility | work will be done at 2700 e bilby rd #3&4 1 5x5 bellhole on concrete/dirt across e bilby. street crossing to abandon gas line. | |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project | |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 100 UNIT 150 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 100 UNIT 170 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 200 UNIT 240 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG A | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG B | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG C | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG C UNIT 300 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 100 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| T01EL00278 | WITHDRWN | 02/07/2001 | N/A | 200 | ELECT | UPGRADE:ELECTRIC TO 200 AMP (SITE LIGHTING) |
| T01EL00982 | FINAL | 04/24/2001 | 10/23/2001 | 100 | ELECT | ELECTRIC:RECONNECT |
| T04BU02471 | FINAL | 10/11/2004 | 04/10/2005 | 100 | SPKLR | FIRE SPKR:ADD 3 |
| T05AN00428 | ISSUED | 04/22/2005 | N/A | 100 | ADDRNEW | |
| T05OT01010 | FINAL | 04/22/2005 | 05/03/2006 | 100 | SIGN | SIGN:#8895 GENUINE INNOVATIONS |
| T06OT01615 | WITHDRWN | 06/16/2006 | N/A | 100 | C-OF-O | C OF O: LABORATORY |
| T06OT01633 | FINAL | 06/19/2006 | 02/11/2007 | 100 | SIGN | 11366 |
| T07MS00301 | ISSUED | 10/02/2007 | N/A | MISC | ||
| T08BU01711 | FINAL | 09/23/2008 | 03/31/2009 | SPKLR | Add 4 and Re-locate 4 sprinkler | |
| T08MS00355 | ISSUED | 11/10/2008 | N/A | MISC | COPIES | |
| T11EL01441 | FINAL | 05/23/2011 | 12/07/2011 | 100 | ELECT | RECONNECT:ELECTRIC:OFFICE |
| T13EX01104 | CLOSED | 10/17/2013 | 12/16/2013 | EXCAV | pLACE 24"X36"X36" VALT IN FRONT OF ADDRESS, PLACE POLE ANCHORS ACCROSS THE STREETAND TWO AT THE NW CORNER OF BILBY RD AND COUNTRY CLUB RD | |
| T14OT00772 | FINAL | 06/12/2014 | 04/28/2015 | 200 | SIGN | A-FRAME |
| T16RW02235 | FINAL | 10/26/2016 | 12/30/2016 | ROW | Starting on the North side of E Bilby Rd on TEP pole 153' ariel overlash, than South crossing E Bilby Rd, 56' strand and cable to TEP pole. On West side of E Bilby Rd, Riser down, 30' Bore/Trench, than South 25' Bore/trench to out ROW | |
| T16RW03318 | FINAL | 12/23/2016 | 06/27/2017 | ROW | From the tiepoint,on the the NW corner of E Bilby Rd , begin 906' new stand and fiber crossing S Tucson Blvd heading East. From the TEP Pole, continue East and begin 502' overlash. From the TEP pole heading South, crossing E Bilby Rd, begin 56' overlash, riser down and begin 251' overpull out of ROW WORK ORDER # 41520160000CTU0362 | |
| T17RW03021 | FINAL | 07/17/2017 | 09/28/2017 | ROW | Transfer of CTL facilities from old to new foreign poles on which CTL is a joint use attachee in order to eliiminate double wood pole situations | |
| T18CM02329 | FINAL | 03/28/2018 | 09/29/2018 | 100 | COMBO | ELECTRICAL RECONNECT |
| T18CM03685 | FINAL | 05/14/2018 | 11/17/2018 | 200 | COMBO | ELECTRICAL RECONNECT |
| T18EL00127 | FINAL | 04/17/2018 | 10/28/2018 | 200 | ELECT | Reconnect, We have additional license 308010, 308011 (VH) |
| T98CM01748 | FINAL | 04/22/1998 | 02/03/1999 | 100 | COMBO | TI:LABRATORY |