Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel107132780
JurisdictionTucson, Pima County
Water Course

Street

City of Tucson ZoningC-3
Tucson WardWard 3
Tucson Registered NeighborhoodKeeling
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 2651 N 1ST AV
Date - 08/19/2026 11:22 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-53-33 Vista Hermosa 1410 1431

Permits

Address: 2651 N 1ST AV
Date - 08/19/2026 11:22 a.m.
Total Number Of Permits - (4)
Permit Status Apply Date Expired Date Unit Type Description
T22BU00102 Issued 03/15/2022 11/13/2024 Commercial Building Billboard Repair
T09ME00743 FINAL 11/19/2009 06/05/2010 MECH RELOCATE HEATERS, ADD 4" VENTING
T09PL01775 FINAL 10/28/2009 06/02/2010 PLUMB GAS LINE UPGRADE (APA)
T21RW01384 FINAL 03/24/2021 04/28/2021 ROW (1) 5X5 BELLHOLE AT THE FRONT OF PROPERTY, CONCRETE SIDEWALK & ASPHALT ROW INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS