Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel12509012A
125010490
JurisdictionTucson
City of Tucson ZoningC-1, R-2
Tucson WardWard 6
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodSam Hughes
Major Streets & Routes

Gateway Route

,

Intersection Buffer

National Register Historic District

Sunshine Mile Historic District

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Rezoning Cases

Date - 12/22/2024 6:29 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-20-11 Sunshine Mile UOD Ordinanced 10/20/2020

Permits

Address: 2635 E BROADWAY BL
Date - 12/22/2024 6:29 a.m.
Total Number Of Permits - (6)
Permit Status Apply Date Expired Date Unit Type Description
TC-COM-0824-01621 Inspections 08/19/2024 04/23/2025 Commercial Building BROADWAY CYCLING - Tenant improvement to an existing commercial masonry building. The building is to remain as is it with no additional square footage added.
TC-COM-0823-01925 Complete 08/07/2023 02/25/2025 Commercial Building Scope of work includes the restoration and remodeling of the exterior shell of an existing retail historic building. Due to the Widening of broadway blvd. the scope of work includes the relocation of the parking area from the south to the north side of the building by means of an added access driveway along the west elevation. The scope also includes added pedestrian access throughout the site as well as steel shade canopies along the south and north elevation.
TD-DEV-0423-00202 Complete 04/07/2023 08/29/2027 Development Package *Revision #2 (GFA update) started 5/14/2024.* *Revision #1 started 2/28/24* Solot Redevelopment
T00EL02614 EXPIRED 11/07/2000 08/12/2002 ELECT SIGN:ELECTRIC: 1607
T15EX03083 FINAL 10/20/2015 12/19/2015 EXCAV ISSAP ATLAS 0032 - ABANDON/ REPLACE/ TIE OVER GAS LINE- NO MAJOR STREET/ROUTE TRAFFIC CONTROL NEEDED TCP -INTERIOR: ALL 1 DAY WORK WITHIN APPROVED TIME ON ANNUAL BLANKET PERMIT T15TC01632
T16OT01263 FINAL 10/18/2016 07/18/2017 SIGN 3-CHANGE OF COPY ON WALL SIGNS

Plans

Address: 2635 E BROADWAY BL
Date - 12/22/2024 6:29 a.m.
Total Number Of Plans - (2)
Plan Number Status Application Date Exp Date Unit Type Description
SD-0623-00069 Complete 06/23/2023 N/A -- Urban Overlay District (UOD) Solot Redevelopment
TP-PRE-0123-00074 In Review 01/10/2023 N/A -- Pre-Application Conference Solot Block redevelopment - scheduled for 2:30 - 3:00

Record Requests

Address: 2635 E BROADWAY BL
Date - 12/22/2024 6:29 a.m.
Total Number Of Requests - (4)
Request Number Status Request Date Completed Date Type Description
REQ-0124-00097 Canceled 01/04/2024 N/A Requests Scope of work includes the restoration and remodeling of the exterior shell of an existing retail historic building. Due to the Widening of broadway blvd. the scope of work includes the relocation of the parking area from the south to the north side of the building by means of an added access driveway along the west elevation. The scope also includes added pedestrian access throughout the site as well as steel shade canopies along the south and north elevation.
REQ-0423-02340 Complete 04/25/2023 04/26/2023 Requests Solot Block redevelopment - scheduled for 2:30 - 3:00
REQ-0923-05309 Complete 09/29/2023 10/25/2023 Requests *ALL HISTORICAL DATA UPLOADED FOR ADDRESS RANGE 2615-1617. FOR NEWER/CURRENT INFO, PLEASE CHECK PRO.* - Hello, Specifically im looking for the date these buildings were built, so any drawings with dates or stamped sets, or permit applications. Thanks!
REQ-0924-05921 Complete 09/03/2024 09/03/2024 Requests Scope of work includes the restoration and remodeling of the exterior shell of an existing retail historic building. Due to the Widening of broadway blvd. the scope of work includes the relocation of the parking area from the south to the north side of the building by means of an added access driveway along the west elevation. The scope also includes added pedestrian access throughout the site as well as steel shade canopies along the south and north elevation.