Parcel Attributes
Parcel12509012A
125090120
JurisdictionTucson
City of Tucson ZoningC-1, R-2
Tucson WardWard 6
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodSam Hughes
Major Streets & Routes

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Rezoning Cases

Date - 11/21/2024 7:26 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-20-11 Sunshine Mile UOD Ordinanced 10/20/2020

Special Development Requests & Requirements

Address: 2631 E BROADWAY BL
Date - 11/21/2024 7:26 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000009288 CLOSED 01/03/2018 N/A Historical Information

Permits

Address: 2631 E BROADWAY BL
Date - 11/21/2024 7:26 p.m.
Total Number Of Permits - (7)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-0923-02566 Complete 09/25/2023 12/04/2023 Right-of-Way (ROW) - Utility EXCAVATE (5) 5'X5' BELL HOLES IN ASPHALT ROW FOR GAS SERVICE REPLACEMENTS.
TC-COM-0823-01925 Complete 08/07/2023 02/25/2025 Commercial Building Scope of work includes the restoration and remodeling of the exterior shell of an existing retail historic building. Due to the Widening of broadway blvd. the scope of work includes the relocation of the parking area from the south to the north side of the building by means of an added access driveway along the west elevation. The scope also includes added pedestrian access throughout the site as well as steel shade canopies along the south and north elevation.
TR-UTL-0524-01065 Complete 05/29/2024 07/03/2024 Right-of-Way (ROW) - Utility 3' x 6' BELL HOLE IN DIRT ALONG WITH APPROX 2' x 10' TRENCH IN DIRT.
TC-COM-0424-00746 Issued 04/26/2024 05/14/2025 Commercial Building Tenant Improvement for new coffee shop
TD-DEV-0423-00202 Complete 04/07/2023 08/29/2027 Development Package *Revision #2 (GFA update) started 5/14/2024.* *Revision #1 started 2/28/24* Solot Redevelopment
T10OT00148 FINAL 01/21/2010 09/12/2010 SIGN 17811
T19CM06280 FINAL 08/28/2019 03/24/2020 COMBO ELECTRICAL RECONNECT

Plans

Address: 2631 E BROADWAY BL
Date - 11/21/2024 7:26 p.m.
Total Number Of Plans - (2)
Plan Number Status Application Date Exp Date Unit Type Description
SD-0623-00069 Complete 06/23/2023 N/A -- Urban Overlay District (UOD) Solot Redevelopment
TP-PRE-0123-00074 In Review 01/10/2023 N/A -- Pre-Application Conference Solot Block redevelopment - scheduled for 2:30 - 3:00

Record Requests

Address: 2631 E BROADWAY BL
Date - 11/21/2024 7:26 p.m.
Total Number Of Requests - (4)
Request Number Status Request Date Completed Date Type Description
REQ-0124-00097 Canceled 01/04/2024 N/A Requests Scope of work includes the restoration and remodeling of the exterior shell of an existing retail historic building. Due to the Widening of broadway blvd. the scope of work includes the relocation of the parking area from the south to the north side of the building by means of an added access driveway along the west elevation. The scope also includes added pedestrian access throughout the site as well as steel shade canopies along the south and north elevation.
REQ-0423-02340 Complete 04/25/2023 04/26/2023 Requests Solot Block redevelopment - scheduled for 2:30 - 3:00
REQ-0923-05309 Complete 09/29/2023 10/25/2023 Requests *ALL HISTORICAL DATA UPLOADED FOR ADDRESS RANGE 2615-1617. FOR NEWER/CURRENT INFO, PLEASE CHECK PRO.* - Hello, Specifically im looking for the date these buildings were built, so any drawings with dates or stamped sets, or permit applications. Thanks!
REQ-0924-05921 Complete 09/03/2024 09/03/2024 Requests Scope of work includes the restoration and remodeling of the exterior shell of an existing retail historic building. Due to the Widening of broadway blvd. the scope of work includes the relocation of the parking area from the south to the north side of the building by means of an added access driveway along the west elevation. The scope also includes added pedestrian access throughout the site as well as steel shade canopies along the south and north elevation.