Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel123010060
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 6
Tucson Registered NeighborhoodBlenman-Elm
Major Street & Route

Arterial or Collector
-
Intersection Buffer

National Register Historic DistrictBlenman-Elm Historic District
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 2530 E ELM ST
Date - 11/17/2026 9:11 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-55-77 Pima To 22nd. Street, City Limits Out to Craycroft Road 1634 2856

Permits

Address: 2530 E ELM ST
Date - 11/17/2026 9:11 p.m.
Total Number Of Permits - (2)
Permit Status Apply Date Expired Date Unit Type Description
T17CM06389 FINAL 08/17/2017 03/14/2018 COMBO SOLAR PV
T21RW02954 FINAL 06/18/2021 07/29/2021 ROW TEAM FISHEL TO MILL AND PAVE A 100'X20 SECTION OF EB E ELM ST JUST PRIOR TO THE EXISTING SPEED BUMP. IN RELATION TO EARLIER WORK DONE AT THE LOCATION. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS