Address Search: 2401 E GLENN ST
Search
Parcel Attributes
| Parcel | 11205278A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 3 |
| Flood Related Information | FEMA Floodplain Area |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 2401 E GLENN ST
Date - 12/09/2025 7:37 a.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 12/09/2025 7:37 a.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date |
|---|---|---|---|---|
| C9-74-25 | Drachman - Tucson Boulevard | R-3 | Effectuated | 06/30/2011 |
Special Development Requests & Requirements
Address: 2401 E GLENN ST
Date - 12/09/2025 7:37 a.m.
Total Number Of Special Development Permits - (2)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000005467 | CLOSED | 09/05/2013 | N/A | Historical Information | RECORD TO SHOW BILLBOARD AZ488/CLEAR CHANNEL #301 REMOVED DUE TO STORM DAMAGE | |
| T10SA00406 | COMPLETE | 11/01/2010 | N/A | Zoning Adminstration Letter |
Permits
Address: 2401 E GLENN ST
Date - 12/09/2025 7:37 a.m.
Total Number Of Permits - (21)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1223-02959 | Issued | 12/29/2023 | 07/23/2024 | Commercial Building | run new gas line from existing gas meter to (2) BBQ locations. | |
| T18OT01128 | Submitted | 10/26/2018 | N/A | Floodplain Use | FUP FOR T18CM08423 - CELL TOWER | |
| T18CM08423 | Expired | 10/22/2018 | N/A | Commercial Building | CELL TOWER -SPRINT - MODIFY EXISTING | |
| T22RW03093 | Complete | 08/26/2022 | 10/09/2022 | Right-of-Way (ROW) | TEP will be removing 2 poles in the ROW 2 2'x2' holes 6' deep will be backfilled with/out sidewalk; Work Order: T25728 | |
| T22CM06384 | Complete | 08/19/2022 | 11/02/2024 | Commercial Building | INSTALLATION OF A NEW 100A 277Y/480V ELECTRICAL SERVICE TO FEED (4) NEW LEVEL 2 ELECTRIC VEHICLE CHA | |
| T21CM03331 | Expired | 04/20/2021 | 08/28/2022 | Commercial Building | PHOTOVOLTAIC SYSTEM, Associated activity numbers DP21-0055 & T21OT00166 | |
| T21OT00166 | Issued | 03/05/2021 | 09/12/2021 | Floodplain Use | NEW COMMERCIAL CANOPY & ROOF-MOUNTED PV SYSTEM | |
| DP21-0055 | Issued | 02/26/2021 | 10/09/2021 | Development Package | Site/Floodplain - Sandpiper Apartments, solar panels, new canopy system. | |
| T02ME00052 | FINAL | 01/31/2002 | 02/19/2003 | MECH | REPLACE:A/C UNIT | |
| T03BU01236 | WITHDRWN | 05/16/2003 | N/A | BUILD | ADDITION:CARPORTS TD#15-37-08 | |
| T04CM00310 | EXPIRED | 01/26/2004 | 12/26/2004 | COMBO | ELECTRIC GATE | |
| T04OT00446 | EXPIRED | 03/04/2004 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
| T11OT01826 | FINAL | 09/22/2011 | 10/14/2012 | SIGN | 90 DAY BANNER 10-1-11 TO 12/29/11 | |
| T12OT00535 | EXPIRED | 04/04/2012 | 10/03/2012 | SIGN | 90 DAY ONLY BANNER 12/30/11 TO 3/28/12 | |
| T16RW02055 | EXPIRED | 10/17/2016 | 01/07/2017 | ROW | Starting on the N. side of E. Adelaide Dr at Cox splice Vault Over pull through Existing Conduit heading E. 233' continue Over Pull heading N. for 4162' then head W. 788' Riser up pole and Over lash to Existing 1 1/4" strand for 2700' then continue Over lash heading S. for 1292' | |
| T17RW04365 | EXPIRED | 10/04/2017 | 11/03/2017 | ROW | 0014 AA- (2) 5' X 5' BELL HOLES AND (1) 40' TRENCH BEHIND CURB IN ASPHALT/CONCRETE/DIRT TO REPLACE GAS LINES | |
| T19RW04604 | FINAL | 08/23/2019 | 09/22/2019 | ROW | TEP will be removing 1 poles (#206) in the ROW, 2'x2' hole 6' deep will be backfilled without sidewalk impact. WO 6275112 | |
| T21RW04918 | FINAL | 11/04/2021 | 01/30/2022 | ROW | From TEP Pole on NE corner of 2401 E Glenn St, place 3x3' pot hole, and 4' trench to place new Cox riser. Tie in. From TEP Pole on SE corner of 2401 E Glenn St, Cox to do aerial maintenance transferring cable to new pole. Traffic control needed only. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 3. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 4. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 5. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 6. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 7. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 8. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 9. MAINTAIN PEDESTRIAN ACCESS 10. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 | |
| T99ME00939 | FINAL | 08/24/1999 | 01/31/2000 | MECH | PRESSURE VESSEL CERTIFICATE:TUC-22141,22142 | |
| TUC-22141 | CERTIFIC | 07/21/1997 | 08/03/2001 | VESSEL | ||
| TUC-22142 | CERTIFIC | 07/21/1997 | 08/03/2001 | VESSEL |
Code Enforcement
Address: 2401 E GLENN ST
Date - 12/09/2025 7:37 a.m.
Total Number Of Code Cases - (1)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO0925-04118 | Closed - Resolved | 09/19/2025 | 11/03/2025 | (Received via email) : Dead palm fronds within 10 feet of power lines |
Record Requests
Address: 2401 E GLENN ST
Date - 12/09/2025 7:37 a.m.
Total Number Of Requests - (2)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-0323-01428 | Complete | 03/03/2023 | 03/07/2023 | Requests | INSTALLATION OF A NEW 100A 277Y/480V ELECTRICAL SERVICE TO FEED (4) NEW LEVEL 2 ELECTRIC VEHICLE CHA |
| REQ-0923-04956 | Complete | 09/12/2023 | 03/11/2024 | Requests | INSTALLATION OF A NEW 100A 277Y/480V ELECTRICAL SERVICE TO FEED (4) NEW LEVEL 2 ELECTRIC VEHICLE CHA |