Parcel Attributes
Parcel140280710
140280310
140280660
JurisdictionTucson
Airport Environs Zone

Tucson International AEZ Paddle

Major Streets & Routes

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 2175 E VALENCIA RD
Date - 11/23/2024 2:14 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Permits

Address: 2175 E VALENCIA RD
Date - 11/23/2024 2:14 a.m.
Total Number Of Permits - (19)
Permit Status Apply Date Expired Date Unit Type Description
T20CM08775 Expired 12/15/2020 06/14/2021 185 Commercial Building Electric Reconnect
T21FC00519 Expired 06/28/2021 07/19/2022 Fire Construction Permit Automatic Fire Extingshing Sys - Modify fire sprinkler system to accommodate existing system.; Commercial Fire Sprinkler Systems - Modification of heads: 3
T22CM04296 Issued 06/09/2022 12/06/2022 125 Commercial Building Turn power back on please. Power turned off since last tenants left January 2022. See suites 185 or
TZ-PMT-0524-00030 Issued 05/03/2024 05/17/2025 Zoning Permit Annual Airpark Manufacturing desires to establish a marijuana manufacturing license, albeit our operations primarily focus on packaging rather than extensive production. With the license type, we have taken measures to mitigate all odors. While odor mitigation is not a primary concern in our operation, we have ensured the utilization of HEPA Charcoal filters as an additional precautionary measure. Additionally, we will continue to maintain the existing odor mitigation system. Our commitment to proactive odor control reflects our dedication to environmental responsibility and regulatory compliance in consistent working order and will be packaging an odor free water soluble, nano emulsion beverage. There will be no use of biomass, flower, raw cannabis, nor any hazardous chemicals. Our process does not require the handling, agitation, heating, transforming, or modification of any cannabis products.
TC-COM-0424-00763 Needs Resubmittal 04/30/2024 10/27/2024 UNIT 185 Commercial Building Request for change(s) in the use of occupancy classification of a building and or a portion of a building.
TZ-REV-0424-00003 Void 04/08/2024 N/A UNIT 185 Zoning Review 60 Day **VOID - WRONG APPLICATION** The space will be utilized for making infused products, once this permit is approved we will be applying for a license through the state of Arizona's Health Department to have an approval to operate. We will be applying for a manufacturing license, there will be no extraction, and no cultivation, just making edibles.
T07BU02631 FINAL 12/20/2007 05/02/2009 SPKLR Install 120 fire sprinklers
T07CM00636 FINAL 02/15/2007 01/20/2010 COMBO NEW SHELL BUILDING # 2
T08BU00180 EXPIRED 01/31/2008 08/04/2008 SPKLR 92 LF 4 IN undergound.
T12CM07855 FINAL 12/12/2012 06/12/2013 COMBO RECONNECT ELECTRIC; COMM
T14BU00909 FINAL 08/12/2014 04/07/2015 #105 SPKLR SPRINKLER
T14BU01125 FINAL 10/13/2014 04/15/2015 #105 BUILD FIRE ALARM
T14CM03437 C OF O 06/05/2014 04/14/2015 #105 COMBO OFFICE
T14CM05087 L OF C 08/07/2014 02/07/2015 COMBO RECONNECT: ELECTRIC
T16CM08260 FINAL 10/31/2016 05/02/2017 #115 COMBO ELECTRICAL RECONNECT
T19CM03699 FINAL 05/23/2019 01/08/2020 #185 COMBO ELECTRICAL UPGRADE UPTO 200AMPS AND SERVICE MODIFICATION
T21CM01012 C OF O 02/02/2021 12/27/2021 #185 COMBO TI: OFFICE/STORAGE
T21CM05444 FINAL 07/01/2021 02/16/2022 COMBO Install three phase 200 amp meter base, disconnect and panel board.
T22CM04327 FINAL 06/10/2022 12/17/2022 #125 COMBO reconnect power