Address Search: 2145 N WATER VIEW CT
Search
Parcel Attributes
| Parcel | 133477010 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 2 |
| Tucson Registered Neighborhood | Bear Canyon |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 2145 N WATER VIEW CT
Date - 10/29/2026 10:16 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 2145 N WATER VIEW CT
Date - 10/29/2026 10:16 p.m.
Total Number Of Permits - (3)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-RES-0326-01414 | Complete | 03/20/2026 | 11/23/2026 | Residential Building - One or Two Family | Replacing both Heating and Cooling Systems (Condensers, Coils, and Furnaces).... Furnaces and Evap Coils are located in the Attic.... | |
| TC-RES-0326-01224 | Inspections Complete | 03/10/2026 | 10/05/2026 | Residential Building - One or Two Family | Stem wall repair Repair Locations: Approximately 15 linear feet along the northwest (NW) elevation, near the pool equipment area Approximately 1 linear foot at the southeast (SE) corner Approximately 4 linear feet along the south (S) elevation Total Approximate Linear Footage: 20 LF Cosmetic repair (parging) Repair Locations: Approximately 4 linear feet along the northwest (N) elevation, near the A/C equipment | |
| TC-RES-0326-01205 | Complete | 03/09/2026 | 11/04/2026 | Residential Building - One or Two Family | Water Heater: Replace existing 50-gallon RUUD with same size, install ball valve on cold line, new flex lines, gas line, pan, and stub out hot/cold lines through exterior wall with individual shut-offs. Kitchen: New valve on icemaker, new flex line, garbage disposal splashguard, replace all three angle stops and supply lines under sink (hot, cold, dishwasher). Laundry Room: Replace laundry box with hammer arresters and supply lines; replace angle stops and supply lines under utility sink (hot & cold). Bathrooms: Replace toilet angle stops with dual angle stops for bidet (3), replace faucet angle stops and supply lines in half bath, rebuild master bathroom Glacier Bay dual flush toilet, replace one angle stop and pop-up assemblies in secondary full bath. Exterior: Replace all three hose bibs with quarter-turns and vacuum breakers, and replace main service riser shut-off valve per customer request (PRV currently 60 psi). |