Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 2005 S HOUGHTON RD
Search
Parcel Attributes
Parcel | 13609015A 136090150 |
---|---|
City of Tucson Zoning | SR |
Tucson Ward | Ward 4 |
Tucson Registered Neighborhood | Houghton East |
Major Streets & Routes | Intersection Buffer ,Scenic Route |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Permits
Address: 2005 S HOUGHTON RD
Date - 11/24/2024 4:48 a.m.
Total Number Of Permits - (10)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T22RW02151 | Complete | 06/14/2022 | 11/29/2022 | Right-of-Way (ROW) | Cox to Trench /bore installing 4 x2” conduits and .144 ct fiber starting on the South side of E 29th; Work Order: PRJ222574-1 | |
TR-ROW-0123-00274 | Complete | 01/18/2023 | 04/03/2023 | Right-of-Way (ROW) | SWG will pothole gas main for confirmation on the location of pipeline and data gathering for relocation project as part of COT Houghton corridor improvement project, 22nd Street to Irvington Road. All our facilities are installed in the dirt within SWG easement and at least 20' away from the road. | |
TR-UTL-0123-00581 | Complete | 01/10/2023 | 05/07/2023 | Right-of-Way (ROW) - Utility | WO T53694. Installation of 3 new 55' TEP poles and 2 anchors added to blue line. (Rest of project based on blue line). | |
T04EX00260 | CLOSED | 03/23/2004 | 05/22/2004 | EXCAV | EXCAV:REPAIR HCS LINE | |
T04EX00283 | CLOSED | 04/02/2004 | 06/01/2004 | EXCAV | EXCAV:REPAIR HCS 100 | |
T04PL00547 | EXPIRED | 03/23/2004 | 09/20/2004 | PLUMB | REPAIR:SEWER LINE (APA) | |
T04PL00609 | EXPIRED | 04/01/2004 | 09/28/2004 | PLUMB | REPAIR:SEWER | |
T17RW01388 | FINAL | 03/27/2017 | 05/03/2017 | ROW | PERFORM 13 VERTICAL BORINGS TO DEPTHS RANGING FROM 10 TO 60 FEET AT THE LOCATIONS DISPLAYED ON SITE PLANS-8 INCH/BORING 29TH & HOUGHTON TO KEYSTONE RD & HOUGHTON HOUGHTON ROAD ROADWAY IMPROVEMENTS PLA # 1-296-014 | |
T20RW04745 | FINAL | 08/24/2020 | 09/24/2020 | ROW | Houghton Road, 22nd Street to Irvington Road, SR1J We will perform a 6 vertical borings to an approximate depth of 7 to 15 feet below existing grade with auger that is 7 inches in diameter. The location of the borings are on the attached site plan. All 6 locations are 10 to 60 feet of the edge of the roadway and will have signage and cones but will require no lane closures. Our work will take approximately 30-60 minutes per location. | |
T99PL01976 | WITHDRWN | 09/10/1999 | N/A | PLUMB | GAS LINE:NEW |
Record Requests
Address: 2005 S HOUGHTON RD
Date - 11/24/2024 4:48 a.m.
Total Number Of Requests - (3)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0223-01330 | Complete | 02/24/2023 | 03/08/2023 | Requests | (PLEASE RENEW FOR 60 DAYS DUE TO CONTINUATION OF JOB) WO T53694. Installation of 3 new 55' TEP poles and 2 anchors added to blue line. (Rest of project based on blue line). |
REQ-0323-01399 | Complete | 03/02/2023 | 03/10/2023 | Requests | SWG will pothole gas main for confirmation on the location of pipeline and data gathering for relocation project as part of COT Houghton corridor improvement project, 22nd Street to Irvington Road. All our facilities are installed in the dirt within SWG easement and at least 20' away from the road. Renew for 30 days |
REQ-0323-01521 | Complete | 03/09/2023 | 03/09/2023 | Requests | SCANNED MICROFICHE |