Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 200 S PANTANO RD
Search
Annexations & Original City Zoning (OCZ)
Address: 200 S PANTANO RD
Date - 01/12/2025 1:02 a.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 01/12/2025 1:02 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-78-23 | Tashman et al - Pantano Road | R-4 | Withdrawn | 05/05/2011 |
Special Development Requests & Requirements
Address: 200 S PANTANO RD
Date - 01/12/2025 1:02 a.m.
Total Number Of Special Development Permits - (3)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000007117 | CLOSED | 08/14/2015 | N/A | Historical Information | ||
T15SA00232 | COMPLETE | 07/07/2015 | N/A | Zoning Adminstration Letter | ||
T20SA00200 | COMPLETE | 07/02/2020 | N/A | Zoning Adminstration Letter | Zoning Compliance Letter Multifamily |
Permits
Address: 200 S PANTANO RD
Date - 01/12/2025 1:02 a.m.
Total Number Of Permits - (5)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-0423-00619 | Complete | 04/10/2023 | 12/22/2023 | BLDG A | Right-of-Way (ROW) | We will be Milling & Paving Pantano Rd from Broadway to 22nd Street. Project FY23 Rehabilitation Package 8 |
T15CM06946 | FINAL | 10/07/2015 | 08/21/2016 | COMBO | T.I;CLUBHOUSE | |
T15OT01623 | EXPIRED | 12/04/2015 | 06/05/2016 | SIGN | 1- NON-ILLUM DF / W TRE / TRE-2015-035A | |
T16CM01401 | FINAL | 02/25/2016 | 08/27/2016 | #227 | COMBO | REPLACE 125 AMP MAIN BREAKER LIKE FOR LIKE |
T21RW01648 | FINAL | 04/08/2021 | 05/17/2021 | ROW | LANE CLOSURE FOR PLACEMENT OF 4300 FT OF AERIAL STRAND AND FIBER, TRENCH/BORE 258 LF, AND PLACE 2" PVC CONDUIT. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. |
Code Enforcement
Address: 200 S PANTANO RD
Date - 01/12/2025 1:02 a.m.
Total Number Of Code Cases - (3)
Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO1023-05981 | Closed - Resolved | 10/10/2023 | 01/17/2024 | BLDG G UNIT 160 | HIGH PRIORITY- RMIN - UNIT 160 - Apartment has severe leak in or around water heater, water might be sewer water. Water has covered floor going into other rooms in unit. Water also has foul smell. | |
CE-VIO0924-03552 | Closed - Resolved | 09/03/2024 | 12/13/2024 | BLDG H UNIT 165 | RMIN / Hole in ceiling that has been completed in the last months | |
CE-VIO0523-03474 | Closed - Unfounded | 05/11/2023 | 07/24/2023 | WASTE / Dog poop bag disposal can have now not been emptied in over 2 weeks.No poop bags have been put out in over months. The cans are overflowing with tons of flies. They are right outside several apartments. Dog poop all over property. Couches and furniture all over by dumpsters. |
Record Requests
Address: 200 S PANTANO RD
Date - 01/12/2025 1:02 a.m.
Total Number Of Requests - (3)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0723-03745 | Complete | 07/07/2023 | 07/11/2023 | Requests | We will be Milling & Paving Pantano Rd from Broadway to 22nd Street. Project FY23 Rehabilitation Package 8 |
REQ-0923-05237 | Complete | 09/27/2023 | 09/27/2023 | Requests | THE WORK WILL NOT BE DONE ON THIS PEMRIT UNTIL 12/15/23 We will be Milling & Paving Pantano Rd from Broadway to 22nd Street. Project FY23 Rehabilitation Package 8 |
REQ-1023-05466 | Complete | 10/06/2023 | 10/06/2023 | Requests | Final Striping will be done by 12/15/23 We will be Milling & Paving Pantano Rd from Broadway to 22nd Street. Project FY23 Rehabilitation Package 8 |