Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel13314236H
JurisdictionTucson
City of Tucson ZoningRX-2
Water Course

Washes

Tucson WardWard 2
Flood Related Information

FEMA Floodplain Area

,

Major Washes

Major Streets & Routes

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 1456 N KOLB RD
Date - 11/23/2024 8:33 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-81-33 Tanque Verde Rd. - Speedway Blvd. 5339 5436

Permits

Address: 1456 N KOLB RD
Date - 11/23/2024 8:33 a.m.
Total Number Of Permits - (7)
Permit Status Apply Date Expired Date Unit Type Description
T10AN00002 ISSUED 01/05/2010 N/A ADDRNEW
T10EL00044 FINAL 01/11/2010 08/09/2010 ELECT TEMP POWER FOR CONSTRUCTION TRAILER
T10EX00042 CLOSED 02/04/2010 04/05/2010 EXCAV EXCV, BACKFILL AND ALL SURFACE REPAIR PER CITY STANDARDS FOR CUTTING CURB TO PLACE 16' WIDE DRIVEWAY ENTRANCE AND PLACEMENT OF A DRIVEWAY APRON PER PC/COT S.D. 206 AS SHOWN ON PLAN FOR PCRFCD PROJECT NO. 5PMULL, 5PTOWN AND 5PKOLB.
T11BU01512 FINAL 11/16/2011 06/17/2012 TEMP-FBB TEMPORARY JOBSITE TRAILER W/ELECTRIC
T17RW01207 FINAL 03/15/2017 03/18/2017 ROW CLOSE NB CURB LANE ON BRIDGE FOR DEDICATION CEREMONY. CLOSE SB KOLB LT LANE AT SABINO CANYON RD.
T19RW03527 FINAL 06/19/2019 07/19/2019 ROW REPLACING FRAME, COVER AND COLLAR OF 3 MANHOLES. COATING THE INTERIOR OF 3 MANHOLES. ADDRESS ON APPLICATION- N. KOLB RD & SABINO CANYON RD
T21RW04385 FINAL 09/23/2021 04/13/2022 ROW TUCSON WATER JOC FOR CATHODIC PROTECTION SYSTEM AND CORROSION MONITORING SERVICES, 151085-2 INSTALLATION OF PAD MOUNTED RECTIFIER AND CABINET. TRENCH 75' TO EXISTING TRANSFORMER. PREVIOUS DRILLING WORK WAS COMPLETED UNDER T21RW01367. ADDRESS ON APPLICATION 1450 N KOLB RD ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.