Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search
Parcel Attributes
Parcel115073060
JurisdictionTucson
City of Tucson ZoningC-3, NR-2
Tucson WardWard 3
Tucson Downtown Incentive ZoneDowntown Infill Incentive District
Tucson Registered NeighborhoodFeldman's
Major Streets & Routes

Intersection Buffer

,

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 1418 N STONE AV
Date - 10/23/2024 3:30 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Blocks 37 Thru 59, Bronx Park 512 None

Permits

Address: 1418 N STONE AV
Date - 10/23/2024 3:30 a.m.
Total Number Of Permits - (3)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-0923-01156 Complete 09/18/2023 12/15/2023 Right-of-Way (ROW) This Project is being done for the Arizona Department of Environmental Quality for the installation of four groundwater monitoring wells in the ROW's adjacent to the locations listed. This project is a continuation of work that was done in 2022. Each well will be installed in the street shoulder and housed in a 12-inch diameter traffic rated vault. Three of the wells will extend to a depth of 130-feet below grade and one will extend to a depth of 200-feet below grade. A fifth location at 105 W Lee St is for repairs to an existing well vault that was damaged during a recent street paving event and will be replaced.
T04EL01710 FINAL 08/17/2004 02/27/2005 ELECT UPGRADE:ELECTRIC TO 200 AMP
T98OT00034 WITHDRWN 02/13/1998 N/A C-OF-O C OF O INSPECTION:RETAIL

Record Requests

Address: 1418 N STONE AV
Date - 10/23/2024 3:30 a.m.
Total Number Of Requests - (1)
Request Number Status Request Date Completed Date Type Description
REQ-1123-06205 Complete 11/13/2023 11/14/2023 Requests I would like to extend our ROW permit for 2 weeks. The well drilling/construction has been completed at all locations; however, we still need to develop one of the wells (105 W Lee St) by surge/bail/pumping. HGC's subcontracted driller will perform this work.