Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel12315149A
123151480
123151490
123151500
JurisdictionTucson
City of Tucson ZoningR-2
Tucson WardWard 6
Tucson Registered NeighborhoodNorth University
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Rezoning Cases

Date - 12/25/2024 5:52 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-74-02 University Expanded Neighborhood Expanded District R-3 Closed 06/30/2011

Special Development Requests & Requirements

Address: 1412 N PARK AV
Date - 12/25/2024 5:52 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
T10SA00093 COMPLETE 03/09/2010 N/A Zoning Adminstration Letter

Permits

Address: 1412 N PARK AV
Date - 12/25/2024 5:52 p.m.
Total Number Of Permits - (10)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-0724-01245 Complete 07/01/2024 09/15/2024 Right-of-Way (ROW) - Utility PRJ274084-1-Cox requesting traffic control permit to be active from 6/29/24 thru 8/29/24. (60-day). NE Exemption to be active from 7/20/24 thru 8/20/24. Cox will work per any holiday moratorium restrictions. Night work to be done 8pm to 6am, should be limited to 2 nights) Noise to be minimal, less than 40 decibels. Cox to modify current fiber equipment, housings, fiber jumpers, to include splicing of same to existing aerial fiber optic cables. Cox Planner: Gibran Palafox- 520-323-6597 Cox Contractor: Truenet- Onsite,(Night() Richard De Bie-520-860-1371 TNE notifications to be made to residents/managers noted.
T13BU00340 FINAL 03/22/2013 12/15/2013 DEMO DEMO SFR
T13OT00429 FINAL 04/08/2013 N/A FLOODPLN FUP - T13BU00340: Demo SFR
T15EX00791 EXPIRED 05/06/2015 07/05/2015 EXCAV WORKING IN ROW TO REPLACE TRENCH TO TRANSFER AN EXISTING RISER AND INSTALL SECONDARY PEDESTAL. CREWS WILL BE DOING THIS WORK TO ELIMINATE A CONFLICT WITH THE COT P1-PARK AVE ENHANCEMENT PROJECT PLANS U-2013-001.
T15TC01069 FINAL 05/06/2015 N/A BARRICAD WORKING IN ROW TO REPLACE TRENCH TO TRANSFER AN EXISTING RISER AND INSTALL SECONDARY PEDESTAL. CREWS WILL BE DOING THIS WORK TO ELIMINATE A CONFLICT WITH THE COT P1-PARK AVE ENHANCEMENT PROJECT PLANS U-2013-001.
T18RW02641 FINAL 06/12/2018 07/14/2018 ROW ADDING NEW EQUIPMENT TO 2 EXISTING POLES; N/B LANE CLOSURE ON PARK AV APPROX 150 FT SOUTH OF DRACHMAN TO 100 FT NORTH ON DRACHMAN ST
T19RW01211 FINAL 03/07/2019 04/17/2019 ROW TEP WILL BE REMOVING 1 POLE AND 1 GUY/ANCHOR PER CUSTOMER REQUEST FOR NEW DEVELOPMENT - CREW TO WORK FROM DIRT WORK IS ON DRACHMAN
T19RW04386 FINAL 08/09/2019 09/08/2019 ROW Re-Install Traffic and Parking Signs, digging 12" post holes or driving u channel poles 2’ deep in dirt. Proposed locations are marked with a white whisker and utilities have been located. Locations are marked with orange dots on the plans attached. WORK IS BEHIND CURB - NO LANES OF TRAFFIC WILL BE AFFECTED. NOTE: WORK IS ON DRACHMAN STREET BEHIND CURB FROM PARK AV TO SANTA RITA AV - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY.
T20RW03113 FINAL 06/02/2020 07/03/2020 ROW (2) 5X5 bell holes in blktp front-- to repair/replace gas line ISSAP APL
T21RW03801 FINAL 08/18/2021 02/26/2022 ROW Tie in at 1001 E Drachman St and Head N 165' Overlashing 48ct Fiber. Continue overlash of 48ct fiber E 464' and Riser Down TEP Pole.Begin Trench/bore Heading S 150' placing 1-2"conduit, a 4'x4' pothole and new Cox Vault. ADDRESS ON APPLICATION: 1001 E DRACHMAN ST PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. NOTE: Park Av, Drachman St, and Fremont Av are under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes.