Address Search: 1303 E ALLEN RD
Search
Parcel Attributes
| Parcel | 11301054B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash+culvert |
| City of Tucson Zoning | R-2 |
| Tucson Ward | Ward 3 |
| Tucson Registered Neighborhood | Campus Farm |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 1303 E ALLEN RD
Date - 08/19/2026 2:42 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 1303 E ALLEN RD
Date - 08/19/2026 2:42 p.m.
Total Number Of Permits - (3)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T22RW03747 | Complete | 10/13/2022 | 01/18/2023 | Right-of-Way (ROW) | Barricade only - Work completed - permit needed for slurry seal only Previously approved permit # T2; Work Order: PRJ202632-1 | |
| T21RW03336 | FINAL | 07/14/2021 | 04/22/2022 | ROW | ON THE S/W CORNER OF E.ALLEN RD AND N MOUNTAIN AV AT COX EXISTING VAULT METRO BORE EAST 61' PLACING A 3' X 3' X 3' POTHOLE CONTINUE BORE NORTH 89' PLACE A 3' X 3' X 3' POTHOLE FOR NEW VAULT CONTINUE TRENCH BORE NORTH 3' TO EXISTING MEET VAULT 12/08/2021 R2 - PLAN CHANGE TO ON THE S/W CORNER OF E.ALLEN RD AND N MOUNTAIN AV AT COX EXISTING VAULT METRO BORE North 78' Then N/E 95' PLACE A 3' X 3' X 3' POTHOLE FOR NEW VAULT CONTINUE TRENCH BORE NORTH 3' TO EXISTING MEET VAULT ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
| T22RW01213 | FINAL | 03/30/2022 | 07/19/2022 | ROW | Barricade only - Work completed - permit needed for slurry seal Previously approved permit T21RW03336 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |