Address Search: 1201 E BILBY RD
Search
Parcel Attributes
| Parcel | 140251080 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | MH-1 |
| Tucson Ward | Ward 5 |
| Tucson Registered Neighborhood | Copper Vista |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 1201 E BILBY RD
Date - 10/28/2026 1:31 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 1201 E BILBY RD
Date - 10/28/2026 1:31 a.m.
Total Number Of Permits - (45)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-RES-0726-04233 | Inspections | 07/30/2026 | 08/05/2027 | UNIT 14 | Residential Building - One or Two Family | Gas reconnect: SW detected a small pinhole leak in the flex line going into the home. We have replaced the flex line and pressure tested the system. |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project | |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 1 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 10 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 11 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 12 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 13 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 14 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 15 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 16 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 17 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 18 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 19 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 2 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 20 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 21 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 22 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 23 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 24 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 3 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 4 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 5 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 6 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 7 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 8 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 9 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
| T21MH00037 | Issued | 04/26/2021 | 10/23/2021 | 22 | Residential Building - One or Two Family | Install new mobile home in space 22 at wheel estates mhp |
| T00ME00034 | EXPIRED | 01/11/2000 | 07/09/2000 | #21 | MECH | FURNACE:REPLACEMENT |
| T00MH00045 | EXPIRED | 01/31/2000 | 08/16/2000 | #17 | MH | MOBILE HOME:SETUP |
| T08EL00229 | FINAL | 02/11/2008 | 08/19/2008 | #22 | ELECT | RECONNECT:ELECTRIC:MH |
| T11CM02645 | FINAL | 08/22/2011 | 02/22/2012 | #23 | COMBO | REPL GAS LINES (APA) |
| T13CM05346 | FINAL | 08/28/2013 | 03/08/2014 | #12 | COMBO | ELECTRIC RECONNECT |
| T14CM08921 | WITHDRWN | 12/29/2014 | 06/27/2015 | #04 | COMBO | ELECTRIC RECONNECT |
| T14CM08961 | FINAL | 12/30/2014 | 07/26/2015 | #04 | COMBO | RECONNECT ELECTRICAL;RES |
| T15CM00319 | FINAL | 01/16/2015 | 07/25/2015 | #04 | COMBO | T15DV00264 - REPLACE LIFELINE AND ELECTRIC WATER HEATER TO RES |
| T15CM02116 | FINAL | 04/01/2015 | 10/05/2015 | #22 | COMBO | ELECTRIC RECONNECT |
| T15CM04309 | FINAL | 06/24/2015 | 12/23/2015 | #22 | COMBO | CHANGE OUT 100 AMP PEDESTAL (APA) |
| T15CM08580 | FINAL | 12/07/2015 | 06/06/2016 | #06 | COMBO | RECONNECT ELECTRIC;RES |
| T16CM03175 | FINAL | 05/02/2016 | 10/30/2016 | #17 | COMBO | RECONNECT ELECTRIC; MH |
| T16CM07360 | FINAL | 09/23/2016 | 03/28/2017 | #24 | COMBO | GAS RECONNECT |
| T18CM09098 | FINAL | 11/15/2018 | 05/18/2019 | #17 | COMBO | GAS RECONNECT |
| T19CM07633 | FINAL | 10/16/2019 | 04/15/2020 | #04 | COMBO | ELECTRICAL RECONNECT |
| T20CM01664 | FINAL | 03/12/2020 | 09/09/2020 | #06 | COMBO | ELECTRICAL RECONNECT |
| T20RW06447 | FINAL | 12/11/2020 | 01/16/2021 | ROW | W/O# 2017613 - REPLACE BROKEN 6" GATE VALVE IN DIRT @ 10 LF. | |
| T97MH00142 | FINAL | 05/27/1997 | 12/13/1997 | #11 | MH | MOBILE HOME SET UP |