Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel108200400
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 3
Tucson Registered NeighborhoodCampus Farm
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 1101 E ROGER RD
Date - 12/06/2025 6:08 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-88-04 Vista Del Norte 7199 7286

Permits

Address: 1101 E ROGER RD
Date - 12/06/2025 6:08 p.m.
Total Number Of Permits - (10)
Permit Status Apply Date Expired Date Unit Type Description
TC-DMO-0825-00171 Approved - Awaiting Customer Attention 08/19/2025 N/A UNIT 2 Demolition Permit The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of unit. - Removal of all electrical wires and electric fixtures from unit. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from unit. - Removal of all kitchen and bathroom cabinetry from unit - Removal of any existing wood flooring and wall/floor tile from unit - Removal of all existing mechanical systems from the interior unit. The interior demolition of this property WILL NOT consist of removing/demoing any of the exterior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition.
TC-DMO-0825-00172 Approved - Awaiting Customer Attention 08/19/2025 N/A UNIT 3 Demolition Permit The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of unit. - Removal of all electrical wires and electric fixtures from unit. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from unit. - Removal of all kitchen and bathroom cabinetry from unit - Removal of any existing wood flooring and wall/floor tile from unit - Removal of all existing mechanical systems from the interior unit. The interior demolition of this property WILL NOT consist of removing/demoing any of the exterior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition.
TC-DMO-0825-00173 Approved - Awaiting Customer Attention 08/19/2025 N/A UNIT 1 Demolition Permit The interior only demolition of the property will consist of: - Removal of water heaters, sinks, bathtubs, and plumbing finishing fixtures from unit. - Removal of all kitchen and bathroom cabinetry from unit - Removal of any existing wood flooring and wall tile from unit The interior demolition of this property WILL NOT consist of removing/demoing any of the exterior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property.
TC-DMO-0825-00166 Void 08/12/2025 N/A Demolition Permit *VOID: Wrong permit type.* -- The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of units 2 and 3. - Removal of all electrical wires and electric fixtures from units 2 and 3. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from units 2 and 3. The bathtub and sinks in unit 1 are to be removed as well. - Removal of all kitchen and bathroom cabinetry from all units - Removal of any existing wood flooring and wall/floor tile from all units - Removal of all existing mechanical systems from the interior all units. The interior demolition of this property WILL NOT consist of removing/demoing any of the interior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition.
TC-DMO-0825-00166 Void 08/12/2025 N/A UNIT 1 Demolition Permit *VOID: Wrong permit type.* -- The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of units 2 and 3. - Removal of all electrical wires and electric fixtures from units 2 and 3. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from units 2 and 3. The bathtub and sinks in unit 1 are to be removed as well. - Removal of all kitchen and bathroom cabinetry from all units - Removal of any existing wood flooring and wall/floor tile from all units - Removal of all existing mechanical systems from the interior all units. The interior demolition of this property WILL NOT consist of removing/demoing any of the interior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition.
TC-DMO-0825-00166 Void 08/12/2025 N/A UNIT 2 Demolition Permit *VOID: Wrong permit type.* -- The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of units 2 and 3. - Removal of all electrical wires and electric fixtures from units 2 and 3. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from units 2 and 3. The bathtub and sinks in unit 1 are to be removed as well. - Removal of all kitchen and bathroom cabinetry from all units - Removal of any existing wood flooring and wall/floor tile from all units - Removal of all existing mechanical systems from the interior all units. The interior demolition of this property WILL NOT consist of removing/demoing any of the interior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition.
TC-DMO-0825-00166 Void 08/12/2025 N/A UNIT 3 Demolition Permit *VOID: Wrong permit type.* -- The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of units 2 and 3. - Removal of all electrical wires and electric fixtures from units 2 and 3. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from units 2 and 3. The bathtub and sinks in unit 1 are to be removed as well. - Removal of all kitchen and bathroom cabinetry from all units - Removal of any existing wood flooring and wall/floor tile from all units - Removal of all existing mechanical systems from the interior all units. The interior demolition of this property WILL NOT consist of removing/demoing any of the interior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition.
T03AN00016 ISSUED 01/08/2003 N/A #01 ADDRNEW
T11PL01473 FINAL 09/07/2011 07/21/2012 #02 PLUMB REPLACE:GAS LINE:TRIPLEX
T13CM00126 FINAL 01/08/2013 07/10/2013 #03 COMBO RECONNECT GAS

Code Enforcement

Address: 1101 E ROGER RD
Date - 12/06/2025 6:08 p.m.
Total Number Of Code Cases - (1)
Case Number Case Status Entered Date Exp Date Unit Type Description
CE-VIO0525-01880 Active 05/05/2025 YARD / Daily yard sales at property, items are left out over night