Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 1101 E ROGER RD
Search
Parcel Attributes
| Parcel | 108200400 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-2 |
| Tucson Ward | Ward 3 |
| Tucson Registered Neighborhood | Campus Farm |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 1101 E ROGER RD
Date - 12/06/2025 6:08 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 1101 E ROGER RD
Date - 12/06/2025 6:08 p.m.
Total Number Of Permits - (10)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-DMO-0825-00171 | Approved - Awaiting Customer Attention | 08/19/2025 | N/A | UNIT 2 | Demolition Permit | The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of unit. - Removal of all electrical wires and electric fixtures from unit. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from unit. - Removal of all kitchen and bathroom cabinetry from unit - Removal of any existing wood flooring and wall/floor tile from unit - Removal of all existing mechanical systems from the interior unit. The interior demolition of this property WILL NOT consist of removing/demoing any of the exterior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition. |
| TC-DMO-0825-00172 | Approved - Awaiting Customer Attention | 08/19/2025 | N/A | UNIT 3 | Demolition Permit | The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of unit. - Removal of all electrical wires and electric fixtures from unit. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from unit. - Removal of all kitchen and bathroom cabinetry from unit - Removal of any existing wood flooring and wall/floor tile from unit - Removal of all existing mechanical systems from the interior unit. The interior demolition of this property WILL NOT consist of removing/demoing any of the exterior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition. |
| TC-DMO-0825-00173 | Approved - Awaiting Customer Attention | 08/19/2025 | N/A | UNIT 1 | Demolition Permit | The interior only demolition of the property will consist of: - Removal of water heaters, sinks, bathtubs, and plumbing finishing fixtures from unit. - Removal of all kitchen and bathroom cabinetry from unit - Removal of any existing wood flooring and wall tile from unit The interior demolition of this property WILL NOT consist of removing/demoing any of the exterior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. |
| TC-DMO-0825-00166 | Void | 08/12/2025 | N/A | Demolition Permit | *VOID: Wrong permit type.* -- The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of units 2 and 3. - Removal of all electrical wires and electric fixtures from units 2 and 3. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from units 2 and 3. The bathtub and sinks in unit 1 are to be removed as well. - Removal of all kitchen and bathroom cabinetry from all units - Removal of any existing wood flooring and wall/floor tile from all units - Removal of all existing mechanical systems from the interior all units. The interior demolition of this property WILL NOT consist of removing/demoing any of the interior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition. | |
| TC-DMO-0825-00166 | Void | 08/12/2025 | N/A | UNIT 1 | Demolition Permit | *VOID: Wrong permit type.* -- The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of units 2 and 3. - Removal of all electrical wires and electric fixtures from units 2 and 3. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from units 2 and 3. The bathtub and sinks in unit 1 are to be removed as well. - Removal of all kitchen and bathroom cabinetry from all units - Removal of any existing wood flooring and wall/floor tile from all units - Removal of all existing mechanical systems from the interior all units. The interior demolition of this property WILL NOT consist of removing/demoing any of the interior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition. |
| TC-DMO-0825-00166 | Void | 08/12/2025 | N/A | UNIT 2 | Demolition Permit | *VOID: Wrong permit type.* -- The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of units 2 and 3. - Removal of all electrical wires and electric fixtures from units 2 and 3. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from units 2 and 3. The bathtub and sinks in unit 1 are to be removed as well. - Removal of all kitchen and bathroom cabinetry from all units - Removal of any existing wood flooring and wall/floor tile from all units - Removal of all existing mechanical systems from the interior all units. The interior demolition of this property WILL NOT consist of removing/demoing any of the interior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition. |
| TC-DMO-0825-00166 | Void | 08/12/2025 | N/A | UNIT 3 | Demolition Permit | *VOID: Wrong permit type.* -- The interior only demolition of the property will consist of: - Removal of all drywall and insulation from the interior walls of units 2 and 3. - Removal of all electrical wires and electric fixtures from units 2 and 3. - Removal of all drainage pipes (up to city connection), water lines (up to city connection), water heaters, sinks, bathtubs, and plumbing fixtures from units 2 and 3. The bathtub and sinks in unit 1 are to be removed as well. - Removal of all kitchen and bathroom cabinetry from all units - Removal of any existing wood flooring and wall/floor tile from all units - Removal of all existing mechanical systems from the interior all units. The interior demolition of this property WILL NOT consist of removing/demoing any of the interior walls. The property does not contain any hazardous materials that would potentially pose a risk during demolition. I, Omar Khatib, am an experienced owner-builder who will be performing that interior only demolition of the property. All current utilities at the property are already currently disconnect. However, an additional verification that all utilities are shut off will be preformed prior to the start of demolition. |
| T03AN00016 | ISSUED | 01/08/2003 | N/A | #01 | ADDRNEW | |
| T11PL01473 | FINAL | 09/07/2011 | 07/21/2012 | #02 | PLUMB | REPLACE:GAS LINE:TRIPLEX |
| T13CM00126 | FINAL | 01/08/2013 | 07/10/2013 | #03 | COMBO | RECONNECT GAS |
Code Enforcement
Address: 1101 E ROGER RD
Date - 12/06/2025 6:08 p.m.
Total Number Of Code Cases - (1)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO0525-01880 | Active | 05/05/2025 | YARD / Daily yard sales at property, items are left out over night |