Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 10629 E KAREN GANNON PL
Search
Annexations & Original City Zoning (OCZ)
Address: 10629 E KAREN GANNON PL
Date - 11/22/2024 10:24 a.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 11/22/2024 10:24 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-05-02 | Civano Master PAD - Houghton | PAD | Effectuated | 06/01/2006 |
Permits
Address: 10629 E KAREN GANNON PL
Date - 11/22/2024 10:24 a.m.
Total Number Of Permits - (2)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-RES-0124-00004 | Complete | 01/02/2024 | 07/07/2024 | Residential Building - One or Two Family | Lowered bar 8" to counter height. Replaced water heater, hot water recirculation pump and HVAC. | |
TC-RES-0124-00009 | Void | 01/02/2024 | 06/30/2024 | Residential Building - One or Two Family | Void - Duplicate/Same scope of work as existing application permit number TC-RES-0124-00009. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf Trade work performed by licensed contractors active in AZ ROC. 1. TAZ Plumbing installed a replacement, 50 gal AO Smith hot water heater (warranty replacement - no charge) and a replacement hot water recirculation pump on 8/14/2021. TAZ Plumbing did not pull a permit and did not ask me if I wanted to have a permit pulled. I was not aware of this permit requirement. I am selling my house. It is active contingent and I need a completed permit. They also wanted to know if a drip pan is required under the water heater if installed on a platform in the garage that is covered on top with metal. 2. Air Quest installed a replacement HVAC - American Standard 5 Ton 14 SEER Split System on 10/14/2021. Air Quest did not pull a permit and did not ask me if I wanted to have a permit pulled. I was not aware of this permit requirement. I am selling my house. It is active contingent and I need a completed permit. |