Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Permits

Address: 102 E BROADWAY BL
Date - 11/26/2024 12:28 p.m.
Total Number Of Permits - (5)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1024-01172 Fees Due 10/03/2024 N/A Right-of-Way (ROW) Each of those locations has a utility box within the ROW (I chose the addresses as close to the utility boxes as possible). The Arts Foundation is working with DTM and Rio Nuevo to wrap these in artist designed vinyl. We are looking to secure permits to allow for the installation at each location. Art work project work to Occur in Multiple locations (corners) within Downtown area. Previous permit TR-ROW-0324-00349
TR-ROW-0324-00349 Complete 03/29/2024 10/09/2024 Right-of-Way (ROW) Each of those locations has a utility box within the ROW (I chose the addresses as close to the utility boxes as possible). The Arts Foundation is working with DTM and Rio Nuevo to wrap these in artist designed vinyl. We are looking to secure permits to allow for the installation at each location. Art work project work to Occur in Multiple locations (corners) within Downtown area. Request Update 7/9/2024: Renewal request 90 days as of 7/11/2024.
T03OT01173 FINAL 06/30/2003 02/16/2004 SIGN SIGN:5734
T16BU00493 FINAL 04/07/2016 03/18/2017 BUILD BILLBOARD REPAIR (30 DAY REVIEW)
T17CM08971 WITHDRWN 12/05/2017 N/A COMBO PARKING LOT KIOSK

Record Requests

Address: 102 E BROADWAY BL
Date - 11/26/2024 12:28 p.m.
Total Number Of Requests - (2)
Request Number Status Request Date Completed Date Type Description
REQ-0624-04593 Denied 06/27/2024 N/A Requests ** DENIED- NO PRE-ACTIVITY MEETING SCHEDULED/ HELD VIA DASHBOARD** Due to weather restrictions the work could not be completed within the initial 30 day permit timeframe. I am requesting a 90 day extension so that the work can be completed when temperatures are 85 degrees or cooler.
REQ-0724-04751 Approved 07/08/2024 07/09/2024 Requests The work could not be complete under extreme heat. We are requesting to extend the permit 90 days. We have a pre-activity meeting scheduled for July 11 at 10:32am.