Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: TR-UTL-1024-01958
Activity
Permits
Date - 11/15/2024 4:57 a.m.
Number Of Permits - (1)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-UTL-1024-01958 | Issued | 10/11/2024 | 12/04/2024 | Right-of-Way (ROW) - Utility | Tie point will be existing plant inside vault. Trench 45' of 2" conduit at a depth 3'. Run 45' of .625 coax. Bore 55' of 2" conduit at a depth of 3'. Run 55' of .625 coax. Trench 350' of 2' conduit at a depth of 3'. Run 350' of .625 coax. Place new vault (24x36x24).Bore 60' of 2" conduit at a depth of 3'. Run 60' of .625 coax.Bore 395' of 2" conduit at a depth of 3'. Run 395' of .625 coax. |