Activity Search: TR-UTL-0326-00573
Activity
Parcel Attributes
| Parcel | 13103224R |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street+culvert |
| City of Tucson Zoning | C-2 |
| Tucson Ward | Ward 4 |
| Tucson Registered Neighborhood | Myers |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 10/20/2026 6:22 p.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0326-00573 | Fees Due | 03/25/2026 | 10/31/2026 | Right-of-Way (ROW) - Utility | T147200 - Crews to park in the City of Tucson ROW to replace (17) TEP poles, remove (1) TEP pole, transfer 2300ft OH conductors, and OH attachments. Down guy anchors are to be replaced at (5) pole locations. 10/01/26- Renew permit for 30 days as of 10/01/26 new expiration date is 10/31/2026. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts. |