Parcel Attributes

Parcel11619113A
JurisdictionTucson, Pima County
City of Tucson ZoningI-1, C-3
Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Infill Incentive District, Downtown Core
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
RedevelopmentDowntown Redevelopment District
Tucson Registered NeighborhoodDowntown
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Permits

Date - 10/15/2026 11:09 p.m.
Number Of Permits - (1)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1026-01128 In Review 10/12/2026 N/A Right-of-Way (ROW) Please Expedite this permit. 1. Signal and Electrical Installation (HAWK Crossing System) • Install a complete HAWK Crossing System: Furnish and erect new signal poles, mast arms, and conduit infrastructure to support the new crossing layout. • Mount Bike HAWK Signals: Install dedicated bicycle and pedestrian HAWK signal heads on both the north and south sides of W. Congress St. • Integrate Illuminated Signs: Wire and mount internal bicycle-illuminated signage onto the signal structures. • Install Pedestrian Push Buttons: Place accessible push buttons on the newly installed signal poles matching the revised sidewalk and ramp alignments. 2. Pavement Markings and Striping • Install ADOT "High Visibility" style crosswalk pavement markings across W. Congress St. to define the HAWK crossing boundary. • Apply shared-use path striping along the crossing paths in accordance with Detail Sheet 45. • Place solid white lines: • 6" white solid line (total length = 150') on the western approach. • 6" white solid line (total length = 200') on the eastern approach. • 12" white solid crosswalk stop bars at the HAWK signal approach points. • Place solid yellow lines: Install 4" yellow solid striping (12 L.F. segments) at path approach radius points. 3. Signage Installation • Install traffic signs on new posts/poles per PAG Detail T419 and T401 specifications, including: • Pedestrian/Bicycle warning signs (W11-15 and W11-15-P plaques). • Regulatory turn restrictions and lane usage signs (R10-23, R9-5, and R3-3). • Install overhead signage: Secure regulatory signage on the new HAWK overhead structure over the travel lanes. • Greenway Branding: Erect new "Greenway Entry Signs" at the northern and southern entrance thresholds of the path crossing per Detail Sheet 45. 4. Removal and Demolition • Obliterate existing lane stripe markings along W. Congress St. where vehicle lanes conflict with the new HAWK crosswalk configuration Work duration will take up to 90 days. City project manager is Geoff Bradmon although Maximino Infante will be attached to permit due to Geoff not having an account on the portal.