Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Activity

 

Permits

Date - 11/27/2024 4:53 a.m.
Number Of Permits - (8)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 1 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 105 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 125 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 2 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 3 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 4 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 5 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
12TH AVE POTHOLE PLANS_V1_V2.PDF DOCUMENTS VIEW
T2 - 12 AVE TCPS COMBINED_V1_V2.PDF DOCUMENTS VIEW