Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: TR-ROW-0923-01115
Activity
Parcel Attributes
Parcel | 137053110 13709005B 13706018C 137060960 137052880 13705293A 137060950 137053070 13706132A 13709006A 13706059A 137052910 13706133B 13705289A 137053080 13709007L 137053090 13705305A 137052920 137052870 137052860 137053100 137060570 137053040 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-2 |
Water Course | Washes |
Tucson Ward | Ward 1 |
Major Streets & Routes | Arterial or Collector |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Address |
Permits
Date - 11/27/2024 4:53 a.m.
Number Of Permits - (8)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS | |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 1 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 105 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 125 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 2 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 3 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 4 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 5 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |