Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: TR-ROW-0624-00653
Permits
Date - 12/23/2024 2:28 p.m.
Number Of Permits - (1)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-0624-00653 | Complete | 06/04/2024 | 07/24/2024 | Right-of-Way (ROW) | AZTEC Engineering Group, Inc. has been contracted by Buesing Corp. to perform up to 12 utility potholes in the alley east of N. Euclid Ave south of Speedway Blvd. to the south property line of 1018 N Euclid Ave. The purpose of the potholing is to identify all utilities that are potentially in conflict with the soil nails required to shore the excavation of a parking garage / basement on the lot at 800 E. Speedway Blvd. Ten (10) of the pothole locations are in the alley described. Up to two (2) potholes will be performed in the parking are behind 1018 N. Euclid Ave ** potholing work being done on private property but barricades set up in ROW for alley closure*** |