Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Activity

 

Parcel Attributes

Parcel129120510
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 5
Tucson Registered NeighborhoodSouth Park
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Permits

Date - 08/19/2026 6:52 a.m.
Number Of Permits - (1)
Permit Status Apply Date Expired Date Unit Type Description
TC-SOL-0924-00573 Complete 09/25/2024 09/08/2025 Solar Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. SA20240925-9-1252-7097-A 9.430 kW DC/7.475 kW AC PV SYSTEM (23) SEG SOLAR SEG-410-BMD-TB MODULES (23) ENPHASE ENERGY IQ8M-72-2-US MICROINVERTERS

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MOD1_LEIDY CARRASCO ENGINEERING COVER LETTER 12-20-24_V1.PDF DOCUMENTS VIEW
10148-167387-259018-11365-APPROVALDOCUMENT_V1.PDF DOCUMENTS VIEW
10148-167387-259018-11366-APPROVALUPLOADS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-RDX12791 LEIDY CARRASCO_V1.PDF DOCUMENTS VIEW