Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: TC-COM-1225-02169
Activity
Parcel Attributes
| Parcel | 111022790 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street |
| City of Tucson Zoning | O-3 |
| Tucson Ward | Ward 3 |
| Tucson Registered Neighborhood | RillitoBend |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 12/11/2025 7:58 a.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1225-02169 | Needs Resubmittal | 12/01/2025 | N/A | Commercial Building | Proposed Scope of Work – Scupper Removal and Replacement (Unit 1020) Property: Park Place Village Condominiums, 3690 N. Country Club Road, Tucson, AZ 85716 Contractor: Servpro of Northeast Tucson & Oro Valley / Marana East (ROC #325611) Reference: Estimate dated 11/14/2025 scupper repair above unit 1020 … Description of Work This project addresses water intrusion originating from the exterior scupper above Unit 1020. The following corrective actions are proposed: Removal of Existing Scupper Carefully detach and remove the failing scupper assembly serving the roof drainage above Unit 1020. Substrate and Envelope Repair Inspect the surrounding area for water damage. Repair and seal the scupper opening and adjacent wall/roof interface to restore the building envelope. Perform necessary stucco repair to return the surface to proper condition. Installation of New Scupper Install a new scupper assembly in the same location. Perform a full three-course application and seal all contact points in and around the scupper to create a continuous waterproof barrier. Finishing Work Apply exterior paint to match the existing building finish. Final seal of the scupper and surrounding repair area to ensure long-term waterproofing. Purpose of Work These repairs are intended to prevent ongoing and future water intrusion into Unit 1020 by restoring the integrity of the roof drainage system and the exterior wall assembly. Estimated Cost $1,598.73 (labor, materials, and installation as stated in contractor estimate) |