Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Activity

 

Parcel Attributes

Parcel11105016B
JurisdictionTucson, Pima County
City of Tucson ZoningR-3, R-2
Tucson WardWard 3
Flood Related InformationFEMA Floodplain Area
Tucson Registered NeighborhoodNorth Dodge
Major Street & Route

Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Permits

Date - 12/09/2025 2:37 a.m.
Number Of Permits - (6)
Permit Status Apply Date Expired Date Unit Type Description
TC-COM-0525-00923 Needs Resubmittal 05/06/2025 N/A BLDG 1 Commercial Building CE-V100325-01163 If this will require more than just permitting the 6 units that were installed without a permit I will have to withdraw this permit proses. We will have to verify the proper installation of the existing systems running condensate drains to proper location load calc on each apartment to ensure the the system is adequate for the space, install fan switched for the fresh air requirement and I will need a document from American Design And Consulting to sing off on the do to it is a commercial project.
TC-COM-0525-00923 Needs Resubmittal 05/06/2025 N/A BLDG 2 UNIT 211 Commercial Building CE-V100325-01163 If this will require more than just permitting the 6 units that were installed without a permit I will have to withdraw this permit proses. We will have to verify the proper installation of the existing systems running condensate drains to proper location load calc on each apartment to ensure the the system is adequate for the space, install fan switched for the fresh air requirement and I will need a document from American Design And Consulting to sing off on the do to it is a commercial project.
TC-COM-0525-00923 Needs Resubmittal 05/06/2025 N/A BLDG 2 UNIT 214 Commercial Building CE-V100325-01163 If this will require more than just permitting the 6 units that were installed without a permit I will have to withdraw this permit proses. We will have to verify the proper installation of the existing systems running condensate drains to proper location load calc on each apartment to ensure the the system is adequate for the space, install fan switched for the fresh air requirement and I will need a document from American Design And Consulting to sing off on the do to it is a commercial project.
TC-COM-0525-00923 Needs Resubmittal 05/06/2025 N/A BLDG 3 UNIT 218 Commercial Building CE-V100325-01163 If this will require more than just permitting the 6 units that were installed without a permit I will have to withdraw this permit proses. We will have to verify the proper installation of the existing systems running condensate drains to proper location load calc on each apartment to ensure the the system is adequate for the space, install fan switched for the fresh air requirement and I will need a document from American Design And Consulting to sing off on the do to it is a commercial project.
TC-COM-0525-00923 Needs Resubmittal 05/06/2025 N/A BLDG 3 UNIT 219 Commercial Building CE-V100325-01163 If this will require more than just permitting the 6 units that were installed without a permit I will have to withdraw this permit proses. We will have to verify the proper installation of the existing systems running condensate drains to proper location load calc on each apartment to ensure the the system is adequate for the space, install fan switched for the fresh air requirement and I will need a document from American Design And Consulting to sing off on the do to it is a commercial project.
TC-COM-0525-00923 Needs Resubmittal 05/06/2025 N/A BLDG 3 UNIT 222 Commercial Building CE-V100325-01163 If this will require more than just permitting the 6 units that were installed without a permit I will have to withdraw this permit proses. We will have to verify the proper installation of the existing systems running condensate drains to proper location load calc on each apartment to ensure the the system is adequate for the space, install fan switched for the fresh air requirement and I will need a document from American Design And Consulting to sing off on the do to it is a commercial project.