Activity Search: T21SA00380
Activity
Special Development Requests & Requirements
Date - 11/09/2026 2:09 p.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T21SA00380 | Approved | 04/26/2022 | Setback & Height DDO | The applicant is proposing to construct a carport and front patio addition to the existing residence. The applicant is seeking zoning approval necessary to allow the construction with a reduced side and front perimeter yard setback. If the DDO is approved, the side street perimeter yard setback would be reduced from (6') to (3") as measured from the carport addition to the north lot line, and the front perimeter setback would be reduced from (20') to (18') from the carport addition to the west lot line, all as shown on the submitted plans. |