Activity Search: T21SA00326
Activity
Special Development Requests & Requirements
Date - 11/17/2026 2:51 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T21SA00326 | Approved | N/A | Setback & Height DDO | The applicant is proposing to construct a second bathroom attached to the north side of the existing residence. The applicant is seeking zoning approval necessary to allow the construction with a reduced side perimeter yard setback. If the DDO is approved, the side perimeter yard setbacks would be reduced from (6') to (4') as measured from the addition to the north lot line all as shown on the submitted plans. |