Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: T21RW03304
Activity
Parcel Attributes
Parcel | 11501155V |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-2 |
Tucson Ward | Ward 3 |
Tucson Registered Neighborhood | Sugar Hill |
Major Streets & Routes | Arterial or Collector ,Intersection Buffer |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Address |
Permits
Date - 11/22/2024 8:39 a.m.
Number Of Permits - (1)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T21RW03304 | Final | 07/12/2021 | 01/20/2022 | ROW | From TEP Pole N of 250 E Grant Rd, Head E and begin 1553' aerial overlash 144ct fiber. Head N and continue 162' aerial overlash 144ct fiber. Riser down pole, head S and continue 13' trench/bore placing 48ct fiber. Place 4x4' pot hole and new Cox vault. Trench/bore 3' placing 2-2" conduit to connect to Verizon vault. From TEP Pole at 2333 N Los Altos Ave, head E and continue 152' aerial overlash 144ct fiber.Head S 5' and continue aerial overlash 144ct fiber into out of ROW. Continuing from out of ROW, continue 38' aerial overlash 144ct fiber in to out of row. Continuing from out of ROW, continue 12' trench/bore placing 48ct fiber. Place 4x4' pot hole and new Cox vault. Continue 3' trench/bore placing 2-2" conduit to connect to Verizon vault. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. NOTE: Grant Rd is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS |