Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Activity

 

Parcel Attributes

Parcel13309109A
JurisdictionTucson
City of Tucson ZoningR-1
Tucson WardWard 2
Flood Related Information

FEMA Floodplain Area

Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Permits

Date - 11/25/2024 6:12 p.m.
Number Of Permits - (1)
Permit Status Apply Date Expired Date Unit Type Description
T21RW03268 Final 07/08/2021 10/30/2021 ROW BORE 2810' TO PLACE 3-1.25" INNERDUCT BORE 348' OF 1-4" DUCT IN SAME SECTION WITH INNERDUCT AND TRENCH 29' TO PLACE 1-4" CONDUIT. PLACE 9-30X48 HANDHOLES AND PLACE 4 DOWN GUYS AND ANCHORS. PLACE AERIAL CABLE AND STRAND FOR 3928' IMMEDIATELY ADJACENT TO, OR DIRECTLY ASSOCIATED WITH A SMALL WIRELESS FACILITY. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 5. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 6. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 7. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 8. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 9. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 10. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 11. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 12. MAINTAIN PEDESTRIAN ACCESS 13. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. 09/10/2021 - PLAN ADD - R1 SATURDAY WORK ALLOWED - KEEP AREA INSPECTOR INFORMED OF EXACT LOCATION WHEN WORKING WEEKENDS.

Documents

File Name Document Type  
T21RW03268 ROW-RIGHT OF WAY VIEW