Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Permits
Date - 08/17/2026 2:32 p.m.
Number Of Permits - (1)
| Permit |
Status |
Apply Date |
Expired Date |
Unit |
Type |
Description |
| T21CM02697 |
Final |
03/25/2021 |
04/12/2022
|
|
COMBO |
Installation of a roof-mounted 12.540 DC KW photovoltaic system, MP UPGRADE 200 AMP |
Documents
| File Name |
Document Type |
|
| 2021-03-25 - UPDATE TO T21CM02697 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| IZJ8JL-RODRIQUEZ URQUIDI PLANS AND SPECS REV A 2021-03-25 - UPLOADED FILE TYPE PLANS SUPPORTINGDOCUMENTS 1 1 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| JOB CARD 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| PERMIT 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| PERMIT_APPLICATION_8-13-20_FILLABLE 2021-03-25 - UPLOADED FILE TYPE PLANS SUPPORTINGDOCUMENTS 1 1 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM02697 PLANS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM02697 SPECS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM02697-SOUTHWEST ELECTRICAL CONTRACTORS, INC-3_25_2021 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM02697 PLANS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM02697 SPECS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM02697 PLANS.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM02697 SPECS.PDF |
DOCUMENTS |
VIEW
|
| 2021-03-25 - UPDATE TO T21CM02697.PDF |
DOCUMENTS |
VIEW
|
| IZJ8JL-RODRIQUEZ URQUIDI PLANS AND SPECS REV A 2021-03-25 - UPLOADED FILE TYPE PLANS; SUPPORTINGDOCUMENTS 1; 1.PDF |
DOCUMENTS |
VIEW
|
| JOB CARD.PDF |
DOCUMENTS |
VIEW
|
| PERMIT.PDF |
DOCUMENTS |
VIEW
|
| PERMIT_APPLICATION_8-13-20_FILLABLE 2021-03-25 - UPLOADED FILE TYPE PLANS; SUPPORTINGDOCUMENTS 1; 1.PDF |
DOCUMENTS |
VIEW
|
| T21CM02697 PLANS.PDF |
DOCUMENTS |
VIEW
|
| T21CM02697 SPECS.PDF |
DOCUMENTS |
VIEW
|
| T21CM02697-SOUTHWEST ELECTRICAL CONTRACTORS, INC-3_25_2021.PDF |
DOCUMENTS |
VIEW
|