Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Permits
Date - 11/14/2026 6:26 a.m.
Number Of Permits - (1)
| Permit |
Status |
Apply Date |
Expired Date |
Unit |
Type |
Description |
| T21CM02345 |
Inspections |
03/16/2021 |
10/21/2021
|
|
Residential Building - One or Two Family |
Installation of roof mounted 14.2kW photovoltaic system / main breaker derate to 150A |
Documents
| File Name |
Document Type |
|
| JOB CARD 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| PERMIT 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM02345 LOAD CALCS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM02345 PLANS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM02345-TITAN SOLAR POWER-3_15_2021 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| WITHDRAW EMAIL 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM02345 LOAD CALCS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM02345 PLANS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM02345 LOAD CALCS.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM02345 PLANS.PDF |
DOCUMENTS |
VIEW
|
| JOB CARD.PDF |
DOCUMENTS |
VIEW
|
| PERMIT.PDF |
DOCUMENTS |
VIEW
|
| T21CM02345 LOAD CALCS.PDF |
DOCUMENTS |
VIEW
|
| T21CM02345 PLANS.PDF |
DOCUMENTS |
VIEW
|
| T21CM02345-TITAN SOLAR POWER-3_15_2021.PDF |
DOCUMENTS |
VIEW
|
| WITHDRAW EMAIL.PDF |
DOCUMENTS |
VIEW
|