Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: T20RW04825
Activity
Parcel Attributes
Parcel | 140152590 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | R-2 |
Tucson Ward | Ward 5 |
Tucson Registered Neighborhood | Cherry Avenue |
Major Streets & Routes | Arterial or Collector ,Intersection Buffer |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Address |
Permits
Date - 11/22/2024 4:55 p.m.
Number Of Permits - (1)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T20RW04825 | Final | 08/31/2020 | 08/20/2021 | ROW | BORE 1525' OF 3-1.25" INNERDUCT AND TRENCH 10' OF 1-4" DUCT DIRECTLY ASSOCIATED WITH SMALL WIRELESS FACILITY. PLACE AERIAL CABLE AND STRAND FOR 3512' AND PLACE 2 DOWN GUYS AND ANCHORS AND 5 HANDHOLES FOR TUC30_056. FPUP TDOT1512 for aerial installation of fiber over Canada Wash on Tucson Bl near Forgeus Av. All conditions from FPUP apply. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 48-HOURS PRIOR TO START OF WORK FOR COORDINATION. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. |