Activity Search: T20RW03573
Activity
Parcel Attributes
| Parcel | 13711434C |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Midvale Park |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 08/18/2026 12:21 a.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T20RW03573 | Final | 06/24/2020 | 09/18/2020 | ROW | BORE 2,459' AND PLACE 3- 1.25" INNERDUCT, TRENCH 10' AND PLACE 1- 4" CONDUIT, PLACE 1,482' OF AERIAL CABLE, PLACE (2) DOWN GUYS AND ANCHORS, PLACE (4) 30" x 48" HANDHOLES AND DIG (6) 2'x5' BORE PIT STARTING AT NW C/o S MIDVALE PARK RD. & W COLONIAL HEIGHTS, END AT SE C/o S CALLE SANTA CRUZ & W DREXEL RD. PROJECT Z3UFBPG108-TUC_TUC30_045. - FIBER INSTALLATION MIDVALE PARK RD. IS UNDER MORATORIUM. MORATORIUM REQUIREMENTS WILL NEED TO BE MET. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. MORATORIUM REQUIREMENTS WILL BE CONVEYED IN THE FIELD BY THE INSPECTOR. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. |